# Commission Implementing Regulation (EU) 2018/545 of 4 April 2018 establishing practical arrangements for the railway vehicle authorisation and railway vehicle type authorisation process pursuant to Directive (EU) 2016/797 of the European Parliament and of the Council (Text with EEA relevance), Article 13: Requirements capture

Extent: E+W+S+N.I.

1. In accordance with the overall objective of managing and mitigating identified risks to an acceptable level, the applicant shall, before submitting an application, undertake a requirements capture process which shall ensure that all the necessary requirements covering the design of the vehicle for its life cycle have been:
(a) identified properly;
(b) assigned to functions or subsystems or are addressed through conditions for use or other restrictions; and
(c) implemented and validated.
2. The requirements capture performed by the applicant shall in particular cover the following requirements:
(a) essential requirements for subsystems referred to in Article 3 and specified in Annex III to Directive (EU) 2016/797;
(b) technical compatibility of the subsystems within the vehicle;
(c) safe integration of the subsystems within the vehicle; and
(d) technical compatibility of the vehicle with the network in the area of use.
3. The risk management process set out in Annex I to Commission Implementing Regulation (EU) No 402/2013 shall be used by the applicant as the methodology for requirements capture as regards the essential requirements ‘safety’ related to the vehicle and subsystems as well as safe integration between subsystems for aspects not covered by the TSIs and the national rules.

---
Source: https://www.legislation.gov.uk/eur/2018/545/article/13 (the official version)
Page: https://openlegislation.uk/eu-regulation-2018-545/article-13
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

