Division 5.1.3
United Kingdom
To control risks where relevant for the safety of operational activities (see 3.1.1. Risk assessment), at least the following shall be taken into account:
- (a)
planning of existing or new train routes and new train services, including the introduction of new types of vehicles, the need to lease vehicles and/or to hire staff from external parties and the exchange of information on the maintenance for operational purposes with entities in charge of maintenance;
- (b)
development and implementation of train timetables;
- (c)
preparation of trains or vehicles before movement, including pre-departure checks and train composition;
- (d)
running trains or movement of vehicles in the different operating conditions (normal, degraded and emergency);
- (e)
adaptation of the operation to requests for removal from operation and notification of return to operation issued by entities in charge of maintenance;
- (f)
authorisations for movements of vehicles;
- (g)
usability of interfaces in train driving cabs and train control centres and with equipment used by maintenance staff.