Division 5.1.3
United Kingdom
To control risks where relevant for the safety of operational activities (see 3.1.1. Risk assessment), at least the following shall be taken into account:
- (a)
identification of the safe boundaries of transport for traffic planning and control based on the design characteristics of the infrastructure;
- (b)
traffic planning, including timetable and train path allocation;
- (c)
real-time traffic management in normal mode and in degraded modes with the application of traffic restrictions of use and the management of traffic disruptions;
- (d)
setting of conditions for running exceptional consignments.