# Commission Delegated Regulation (EU) 2018/762 of 8 March 2018 establishing common safety methods on safety management system requirements pursuant to Directive (EU) 2016/798 of the European Parliament and of the Council and repealing Commission Regulations (EU) No 1158/2010 and (EU) No 1169/2010 (Text with EEA relevance), Division 5.2.4

Extent: E+W+S+N.I.

To control risks where relevant for the supply of maintenance (see 3.1.1. Risk assessment), at least the following shall be taken into account:
(a) the identification of the need for maintenance to keep the infrastructure in a safe operational state, based on the planned and real use of the infrastructure and its design characteristics;
(b) the management of the removal of the asset from operation for maintenance, when defects have been identified or when asset condition degrades outside the limits of a safe operational state as referred to in point (a);
(c) the management of the return to operation of the asset with eventual restrictions of use after maintenance has been delivered to ensure it is in a safe operational state;
(d) the management of monitoring and measurement equipment to ensure that it is fit for its intended purpose.

---
Source: https://www.legislation.gov.uk/eur/2018/762/annex/II/division/5/division/5.2/division/5.2.4 (the official version)
Page: https://openlegislation.uk/eu-regulation-2018-762/annex-II/division-5/division-5.2/division-5.2.4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

