# Regulation (EU) 2019/1009 of the European Parliament and of the Council of 5 June 2019 laying down rules on the making available on the market of EU fertilising products and amending Regulations (EC) No 1069/2009 and (EC) No 1107/2009 and repealing Regulation (EC) No 2003/2003 (Text with EEA relevance), Division 4.4.4.3.2.1

Extent: E+W+S+N.I.

Place the tube upright with its square bottom plate resting on a firm, flat surface, preferably concrete. Fill the tube to about one-third of its height with the test sample and drop it 10 cm vertically onto the flat surface five times to compact the prills or granules as densely as possible in the tube. To accelerate compaction, vibrate the tube by striking the side wall with a 750 g to 1 000 g hammer between drops for a total of 10 times.

---
Source: https://www.legislation.gov.uk/eur/2019/1009/annex/IV/part/II/division/2/division/4/division/4.4/division/4.4.4/division/4.4.4.3/division/4.4.4.3.2.1 (the official version)
Page: https://openlegislation.uk/eu-regulation-2019-1009/annex-IV/part-II/division-2/division-4/division-4.4/division-4.4.4/division-4.4.4.3/division-4.4.4.3.2.1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

