Division 5 The formal process laid down in point 4 shall include, as a minimum, relevant agreed procedures, timescales and performance targets for the completion of the following activities:
United Kingdom
- (a)
submission of applications for SSR transponder code allocations;
- (b)
assessment of applications for SSR transponder code allocations;
- (c)
coordination of proposed amendments to SSR code transponder allocations with F1neighbouring States;
- (d)
periodic audit of the code allocations and needs with a view to optimisation of the situation, including re-allocation of existing codes allocations;
- (e)
periodic amendment, approval and distribution of the overall SSR code transponder allocation list referred to in point 3;
- (f)
notification, assessment and resolution of unplanned conflicts between assignments of SSR transponder codes;
- (g)
notification, assessment and resolution of wrong assignments of SSR transponder codes, detected at code retention checks;
- (h)
notification, assessment and resolution of unplanned shortfalls in allocations of SSR transponder codes;
- (i)
provision of data and information in accordance with the requirements laid down in Part C.
Annotations
Textual amendments
- F1
Words in Annex 4 Pt. A Point 5 substituted (31.12.2020) by The Air Traffic Management (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/694), regs. 1(2), 50(2)(e)
Notes on Part A
Textual amendments
- F1
Word in Annex 4 Pt. A heading substituted (31.12.2020) by The Air Traffic Management (Amendment etc.) (EU Exit) Regulations 2020 (S.I. 2020/694), regs. 1(2), 50(2)(a)