  "url": "https://openlegislation.uk/eu-regulation-2019-1842/article-2a",
  "json_url": "https://openlegislation.uk/eu-regulation-2019-1842/article-2a.json",
  "legislation": "eur/2019/1842",
  "legislation_title": "Commission Implementing Regulation (EU) 2019/1842 of 31 October 2019 laying down rules for the application of Directive 2003/87/EC of the European Parliament and of the Council as regards further arrangements for the adjustments to free allocation of emission allowances due to activity level changes",
  "legislation_url": "https://openlegislation.uk/eu-regulation-2019-1842",
  "path": "article/2a",
  "kind": "article",
  "number": "2a",
  "heading": "Sub-installation to be treated as ceasing operation: regulator’s notice",
  "text": "(1.) Where the regulator gives a notice under paragraph 2 to the operator of an installation that includes a sub-installation at which all operations have ceased, the sub-installation must be treated as having ceased operation for the purposes of this Regulation on the last day on which operations were carried out at the sub-installation.\n(2.) A notice under this paragraph is a notice that states that the regulator considers that all operations have permanently ceased at the sub-installation.\n(3.) The regulator may give a notice under paragraph 2 if, at any time during which all operations have ceased at a sub-installation, the operator fails to satisfy the regulator (whether in accordance with Article 3(9) or otherwise) that each of the following conditions is met in respect of the sub-installation:\n(a) the operator intends for operations to resume at the sub-installation;\n(b) either:\n(i) the sub-installation is technically capable of resuming those operations without physical changes being made; or\n(ii) the operator intends for the technical capability required for those operations to resume to be restored at the sub-installation.\n(4.) To avoid doubt, nothing in this Article prevents the regulator from giving a notice under paragraph 2 in circumstances in which the regulator has previously confirmed that the regulator was, at that time, satisfied that the conditions referred to in paragraph 3 were met in respect of the sub-installation.\n(5.) The regulator may withdraw a notice under paragraph 2 at any time by giving notice of the withdrawal to the operator.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Art. 2a inserted (2.2.2025) by The Greenhouse Gas Emissions Trading Scheme (Amendment) Order 2025 (S.I. 2025/100), arts. 2(2), 12"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eur/2019/1842/article/2a",
    "retrieved_at": "2026-11-01T14:43:02.825885+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}