Division 1 TECHNICAL SCOPE
United Kingdom
These specifications concern data about the following structural subsystems of the F1UK rail system:
- (a)
the infrastructure subsystem;
- (b)
the energy subsystem;
- (c)
the trackside control-command and signalling subsystem.
Annotations
Textual amendments
- F1
Word in Annex para. 1 substituted (31.12.2020) by The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), regs. 1(2)(c), 30(2)