Division 3.2.2
United Kingdom
Items to be published for ‘section of line’ related to infrastructure, energy and track-side control-command and signalling subsystems shall be assigned to the infrastructure element ‘running track’.
Notes on Division 3
Textual amendments
- F1
Word in Annex para. 3 heading omitted (31.12.2020) by virtue of The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), regs. 1(2)(c), 30(5)(a)
- F2
Words in Annex para. 3 omitted (31.12.2020) by virtue of The Railways (Interoperability) (Miscellaneous Amendments and Revocations) (EU Exit) Regulations 2020 (S.I. 2020/318), regs. 1(2)(c), 30(5)(b)