OpenLegislation

Division 3 Transitional arrangements:

United Kingdom

Original text. Later amendments are not shown.

  1. (a)

    If major adaptations of the national production system are necessary, the data for reference periods starting from January/1st Quarter 2021 to December/4th Quarter 2023 can be sent after the data transmission deadlines specified in Tables 2, 3, 5, 6 and 8, but not later than the transmission deadlines set in the Tables 2, 3, 5, 6 and 8 for the reference periods January/1st Quarter 2024.

  2. (b)

    For reference periods before January 2024, the variable 140101 Production (volume) of Annex I, Part B, Table 6 for NACE Section F shall be broken down by B-115 (B-115 can be approximated as the sum of Divisions F41 and F43) and B-116 (B-116 can be approximated by Division F42).