Division 5.1 Instructions for use
United Kingdom
See use-specific instructions for each use.
Always read the label or leaflet before use and follow all the instructions provided.
The product must be brought to a temperature above 20°C before use.
The use of a dosing pump for filling the product into the application equipment is recommended. Fill the dipping/foaming cup/sprayer manually or automatically with the ready to use product.
Where necessary repeat the application at each milking
Clean the application equipment regularly with warm water.
Notes on Division 5
Footnotes
- f1
-
Instructions for use, risk mitigation measures and other directions for use under this section are valid for any authorised uses within the meta SPC2.