# Commission Implementing Regulation (EU) 2020/387 of 9 March 2020 amending Regulations (EU) No 321/2013, (EU) No 1302/2014 and (EU) 2016/919 as regards the extension of the area of use and transition phases (Text with EEA relevance), Article 3: Amendments to CCS TSI

Extent: E+W+S+N.I.

Regulation (EU) 2016/919 is amended as follows:
(1) in Article 2, paragraph 2 is replaced as follows:
‘2. The TSI shall not apply to existing “trackside control-command and signalling” and “on-board control-command and signalling” subsystems of the rail system already placed in service on all or part of any Member State’s railway network on the day this Regulation enters into force, except when
(a) the subsystem is subject to renewal or upgrading in accordance with Section 7 of the Annex to this Regulation; or
(b) the area of use is extended in accordance with Article 54(3) of Directive (EU) 2016/797, in which case the provisions of Section 7.4.2.4 of the Annex to this Regulation shall apply.’
(2) the Annex is amended in accordance with Annex III to this Regulation.

---
Source: https://www.legislation.gov.uk/eur/2020/387/article/3 (the official version)
Page: https://openlegislation.uk/eu-regulation-2020-387/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

