# The Feed-in Tariffs (Amendment) (No. 2) Order 2015, Article 3: Article 9 (preliminary accreditation)


In article 9 (preliminary accreditation)—
(a) for paragraph (1), substitute—
“(1) This article applies where a person (“the prospective FIT generator”)—
(a) proposes to construct or operate an eligible installation (other than an extension) which, when commissioned, will—
(i) use anaerobic digestion;
(ii) be a hydro generating station; or
(iii) be a wind or solar photovoltaic installation, and have a declared net capacity of more than 50 kilowatts; and
(b) makes an application in writing to the Authority for preliminary accreditation, which is received by the Authority on or before 30th September 2015.”; and
(b) in paragraph (2), for “upon an application in writing by the prospective FIT generator,”, substitute “upon receiving the application referred to in paragraph (1)(b),”.

---
Source: https://www.legislation.gov.uk/uksi/2015/1659/article/3 (the official version)
Page: https://openlegislation.uk/feed-in-tariffs-amendment-no-2-order-2015/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

