# The Feed-in Tariffs (Amendment) Order 2017, Article 9: Amendment to Schedule 1A (limits on aggregate capacity of eligible installations)


In Schedule 1A, after Table 1 insert—
“
Table 2
Limit of aggregate installed capacity of eligible installations (in megawatts) applied for in respect of eligible combined heat and power installations for a particular tariff period
1st April to 30th September 2017
1st October 2017 to 31st March 2018
1st April to 30th September 2018
1st October 2018 to 31st March 2019
Combined heat and power installation with total installed capacity of 2 kilowatts or less
5.0
5.0
5.0
5.0
”

---