  "url": "https://openlegislation.uk/feed-in-tariffs-closure-etc-order-2018/article-16",
  "json_url": "https://openlegislation.uk/feed-in-tariffs-closure-etc-order-2018/article-16.json",
  "legislation": "uksi/2018/1380",
  "legislation_title": "The Feed-in Tariffs (Closure, etc.) Order 2018",
  "legislation_url": "https://openlegislation.uk/feed-in-tariffs-closure-etc-order-2018",
  "path": "article/16",
  "kind": "article",
  "number": "16",
  "heading": "Amendment to Schedule A1 (MCS-certified installations)",
  "text": "(1) Schedule A1 is amended as follows.\n(2) In paragraph 2(a)—\n(a) in paragraph (i), after “a solar photovoltaic installation”, insert “with a commissioning date on or before 11th March 2019”;\n(b) after paragraph (i), insert—\n“(ia) a solar photovoltaic installation with a commissioning date on or after 12th March 2019, version 3.4 of the document entitled Microgeneration Installation Standard: MIS 3002 requirements for MCS contractors undertaking the supply, design, installation, set to work commissioning and handover of solar-photovoltaic (PV) microgeneration systems (published on 9th November 2018);”;\n(c) in paragraph (iii), after “a heat-led combined heat and power installation”, insert “with a commissioning date on or before 11th March 2019”;\n(d) at the end of paragraph (iii), omit “or”;\n(e) after paragraph (iii), insert—\n“(iiia) a heat-led combined heat and power installation with a commissioning date on or after 12th March 2019, version 3.3 of the document entitled Microgeneration Installation Standard: MIS 3007 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a heating system containing a micro-cogeneration package or add-on units (published on 12th November 2018);”;\n(f) in paragraph (iv), after “an electricity-led combined heat and power installation”, insert “with a commissioning date on or before 11th March 2019”;\n(g) after paragraph (iv), insert—\n“(iva) an electricity-led combined heat and power installation with a commissioning date on or after 12th March 2019, version 2.4 of the document entitled Microgeneration Installation Standard: MIS 3007-2 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a heating system containing an electricity-led micro-cogeneration package or add-on unit(s) (published on 12th November 2018); or”.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "Available at https://www.microgenerationcertification.org/mcs-standards/installer-standards/solar-pv/ and from the Department of Business, Energy and Industrial Strategy at 1 Victoria Street, London, SW1H 0ET on request."
    },
    {
      "type": "footnote",
      "label": "f2",
      "text": "Available at https://www.microgenerationcertification.org/mcs-standards/installer-standards/micro-combined-heat-and-power-systems-micro-chp/ and from the Department of Business, Energy and Industrial Strategy at 1 Victoria Street, London, SW1H 0ET on request."
    },
    {
      "type": "footnote",
      "label": "f3",
      "text": "Available at https://www.microgenerationcertification.org/mcs-standards/installer-standards/micro-combined-heat-and-power-systems-micro-chp/ and from the Department of Business, Energy and Industrial Strategy at 1 Victoria Street, London, SW1H 0ET on request."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2018/1380/article/16",
    "retrieved_at": "2026-10-28T22:50:08.273153+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}