(1) In this Order—
“the Act” means the Energy Act 2008;
“the 1989 Act” means the Electricity Act 1989 ;
“accreditation” means approval by the Authority of an eligible installation as an accredited FIT installation under Part 3, unless the context otherwise requires;
“accredited FIT installation” means an eligible installation which has been given accreditation;
“anaerobic digestion” means the bacterial fermentation of organic material in the absence of free oxygen (excluding anaerobic digestion of sewage and material in a landfill);
“the Authority” means the Gas and Electricity Markets Authority;
“central FIT register” means the register kept and maintained by the Authority in accordance with article 21;
“commissioning date”, in relation to an installation, means the date on which the installation is commissioned;
“community energy installation” has the meaning given in article 11;
“community organisation” has the meaning given in article 11;
“deemed export payment” means the payment made to a FIT generator or nominated recipient by a FIT licensee in respect of a deemed export of electricity;
“distribution system” has the same meaning as in section 4(4) of the 1989 Act ;
“electricity supply licence” means a licence granted by the Authority under section 6(1)(d) of the 1989 Act;
“energy performance certificate” has the same meaning as in—
(a) the Energy Performance of Buildings (England and Wales) Regulations 2012; in relation to a building in England or Wales; and
(b)the Energy Performance of Buildings (Scotland) Regulations 2008 , in relation to a building in Scotland;
“extension” means an increase in the capacity of an installation to generate electricity;
“FIT” means feed-in tariff;
“grant from public funds” means a grant made by a public authority or by any person distributing funds on behalf of a public authority;
“grid connection” means a connection between a generating installation and a transmission system or distribution system for the purpose of enabling electricity to be conveyed from the installation to that system;
“hydro generating station” means a generating installation driven by water, except for such an installation—
(a)driven by waves, ocean currents or geothermal sources;
(b)driven by tidal flows, unless also driven partly by non-tidal flows from a water course; or
(c)where the hydrostatic head of the water has been increased by pumping;
“levelisation fund” means the fund maintained under article 25;
“licensee” means a person who is a holder of a licence under section 6(1)(d) of the 1989 Act;
“MCS”, except in Schedule A1, means the Microgeneration Certification Scheme or equivalent schemes accredited in accordance with EN 45011(2) or EN ISO/IEC 17065:2012(3) which certify microgeneration products and installers in accordance with consistent standards;
“MCS certificate” means a certificate given under the MCS;
“MCS-certified installation” has the meaning set out in Schedule A1 to this Order;
“mutualisation distribution”, “mutualisation notice” and “mutualisation payment” have the meaning given by article 30A(3);
“pause period” has the meaning given in article 8A;
“ROO” means the Renewables Obligation Order 2009 in relation to an installation in England and Wales, and the Renewables Obligation (Scotland) Order 2009 in relation to an installation in Scotland;
“school installation” has the meaning given in article 12;
“Standard Licence Condition 33” and “Standard Licence Condition 34” mean the conditions so numbered in the standard conditions of electricity supply licences ;
“tariff code” has the meaning given in article 13;
...
“transmission system” has the same meaning as in section 4(4) of the 1989 Act .
“working day” means any day other than a Saturday or a Sunday, Christmas Day, Good Friday or a day which is a bank holiday within the meaning of the Banking and Financial Dealings Act 1971.
(2) In this Order the following expressions have the meanings given to them in Schedule A to Standard Licence Condition 33—
“commissioned”;
“confirmation date”;
“declared net capacity”;
“deemed export”;
“eligibility date”;
“eligible installation”;
“eligible low-carbon energy source”;
“energy efficiency requirement”;
“export”;
“export meter”;
“export payment”;
“export tariff”;
“FIT generator”;
“FIT licensee”;
“FIT notification”;
“FIT payments”;
“FIT scheme”;
“FIT year”;
“generation meter”;
“generation meter reading”;
“generation payment”;
“generation tariff”;
“insolvency event”
“mandatory FIT licensee”
...
“MCS-certified registration”;
“MCS-FIT technology”;
“nominated recipient”;
“qualifies for accreditation;”
“statement of FIT terms”;
“tariff date”;
“tariff period”;
“total installed capacity”.
“voluntary FIT licensee”
(3) In this Order—
“last resort supply direction” has the meaning given to it in the standard conditions of electricity supply licences; and
“stand-alone solar photovoltaic” has the meaning given to it in Annex 3 to Schedule A to Standard Licence Condition 33 of the standard conditions of electricity supply licences.
(4) In this Order, a reference to a particular description of eligible installations is a reference to eligible installations of one of the descriptions in the first column of the table in Schedule 1A.

---
Source: https://www.legislation.gov.uk/uksi/2012/2782/article/2 (the official version)
Page: https://openlegislation.uk/feed-in-tariffs-order-2012/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.