Paragraph 2
In this Part of this Schedule—
-
“construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;
-
“the engineer” means an engineer appointed by Network Rail for the purposes of this Order;
-
“plans” includes sections, designs, design data, software, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of railway property;
-
“railway operational procedures” means procedures specified under any access agreement (as defined in the 1993 Act) or station lease;
-
“railway property” means any railway belonging to Network Rail and any station, land, works, apparatus and equipment belonging to Network Rail or connected therewith and includes any easement or other property interest held or used by Network Rail for the purposes of such railway or works, apparatus or equipment; and
-
“specified work” means so much of any of the authorised works as is situated upon, across, under, over or within 15 metres of, or may in any way affect, railway property.