# The Ferrybridge Multifuel 2 Power Station Order 2015, Article 23: Certification of documents

Extent: E+W+S

(1) The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State a printed copy of each of the documents submitted with the application for this Order and listed in paragraph (2), for certification that it is a true copy of the document referred to in this Order.
(2) The documents are—
(a) the biodiversity strategy;
(b) the book of reference;
(c) the combined heat and power assessment;
(d) the design and access statement;
(e) the environmental statement, including the figures and appendices;
(f) the grid connection statement;
(g) the indicative generating station site layout, elevations and sections – concept layout;
(h) the indicative landscaping plan;
(i) the land plan;
(j) the landscaping strategy;
(k) the lighting strategy;
(l) the Order plan;
(m) the statement of engagement of section 79(1) of the Environmental Protection Act 1990;
(n) the statement of reasons;
(o) the works plans.
(3) A document certified in accordance with paragraph (1) is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

---
Source: https://www.legislation.gov.uk/uksi/2015/1832/article/23 (the official version)
Page: https://openlegislation.uk/ferrybridge-multifuel-2-power-station-order-2015/article-23
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.