  "url": "https://openlegislation.uk/ferrybridge-multifuel-2-power-station-order-2015/schedule-2/paragraph-4",
  "json_url": "https://openlegislation.uk/ferrybridge-multifuel-2-power-station-order-2015/schedule-2/paragraph-4.json",
  "legislation": "uksi/2015/1832",
  "legislation_title": "The Ferrybridge Multifuel 2 Power Station Order 2015",
  "legislation_url": "https://openlegislation.uk/ferrybridge-multifuel-2-power-station-order-2015",
  "path": "schedule/2/paragraph/4",
  "kind": "paragraph",
  "number": "4",
  "heading": "Detailed design",
  "text": "(1) Work No. 1 must not commence until written details of the following have been submitted to and approved by the planning authority—\n(a) the siting, layout, scale and external appearance (including the colours, materials and surface finishes) of all new temporary and permanent buildings;\n(b) the internal roads, ramps, turning facilities, parking, loading and unloading facilities, weighbridges, hardstandings and pedestrian and cycle facilities and routes;\n(c) drainage, storage tanks and external lighting;\n(d) finished ground and floor levels.\n(2) Work No. 2 must not commence until written notice of which one of Work No. 2A, Work No. 2B or Work No. 2C has been selected as the connection to the electricity grid network, including details of the design of the option selected, has been submitted to and approved by the planning authority.\n(3) Work No. 3 must not commence until written details of the following have been submitted to and approved by the planning authority—\n(a) surfacing\n(b) drainage;\n(c) fencing;\n(d) external lighting;\n(e) pedestrian and cycle facilities and routes.\n(4) Work No. 4 must not commence until written notice of which one of Work No. 4A or Work No. 4B has been selected as the connection to the foul water system, including details of the design of the option selected, has been submitted to and approved by the planning authority.\n(5) All details submitted and approved under subparagraph (1), (2), (3) or (4) must be in accordance with the design and scale parameters set out in chapter 3 of the environmental statement.\n(6) The authorised development must be carried out in accordance with the approved details.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 4 in force at 19.11.2015, see art. 1(2)"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2015/1832/schedule/2/paragraph/4",
    "retrieved_at": "2026-10-28T23:31:05.805955+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}