# The Ferrybridge Multifuel 2 Power Station Order 2015, Schedule 3: MAXIMUM BUILDING DIMENSIONS

Extent: E+W+S

Building
Maximum length (metres)
Maximum width (metres)
Maximum height (metres above ordnance datum (Newlyn))
Tipping hall (Work No. 1A)
45
102
53
Fuel storage bunker (Work No. 1A)
42
102
64
Entry ramp to fuel storage bunker (Work No. 1A)
120
70
27
Exit ramp from fuel storage bunker (Work No. 1A)
120
70
27
Boiler hall (Work No. 1A)
63
60
74
Turbine hall (Work No. 1A)
40
40
44
Ash storage bunker and collection bay (Work No. 1A)
43
48
39
Flue gas treatment system (Work No. 1A)
55
82
56
Air cooled condenser (Work No. 1A)
98
40
41
Electrical switchyard, including circuit breaker and transformer (Work No. 1A)
40
15
31
Workshop building (Work No. 1A)
30
40
39
Control and administrative building (Work No. 1A)
15
55
64
Security gatehouses and weighbridges (Work No. 1B)
20
4
20
Substation (Work No. 2C)
90
55
36

---
Source: https://www.legislation.gov.uk/uksi/2015/1832/schedule/3 (the official version)
Page: https://openlegislation.uk/ferrybridge-multifuel-2-power-station-order-2015/schedule-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.