# The Ferrybridge Multifuel 2 Power Station Order 2015, Schedule 4: MINIMUM BUILDING DIMENSIONS

Extent: E+W+S

Building
Minimum length (metres)
Minimum width (metres)
Minimum height (metres above ordnance datum (Newlyn))
Tipping hall (Work No. 1A)
31
58
31
Fuel storage bunker (Work No. 1A)
31
58
49
Entry ramp to fuel storage bunker (Work No. 1A)
55
25
24
Exit ramp from fuel storage bunker (Work No. 1A)
55
25
24
Boiler hall (Work No. 1A)
27
45
57
Turbine hall (Work No. 1A)
27
27
34
Ash storage bunker and collection bay (Work No. 1A)
13
13
29
Flue gas treatment system (Work No. 1A)
40
70
46
Air cooled condenser (Work No. 1A)
63
18
34
Electrical switchyard, including circuit breaker and transformer (Work No. 1A)
27
9
25
Workshop building (Work No. 1A)
10
15
26
Control and administrative building (Work No. 1A)
27
11
46
Security gatehouses and weighbridges (Work No. 1B)
10
2.5
19
Substation (Work No. 2C)
80
50
34

---
Source: https://www.legislation.gov.uk/uksi/2015/1832/schedule/4 (the official version)