# The Five Estuaries Offshore Wind Farm Order 2025, Paragraph 11


The total length of the cables in Work No. 1(b) and the volume of their cable protection (including cable crossings) must not exceed the following—
Work
Length
Cable protection
Work No. 1
200 kilometres
321,600 square metres
187,600 cubic metres

---