# The Five Estuaries Offshore Wind Farm Order 2025, Schedule 15: Documents to be certified

Extent: E+W

The following documents in Table 1 of this schedule are the list referred to in article 43
Table 1
Document Number
Name
Version
Date
2.1
Location plan - Onshore
Revision B
September 2024
2.2
Location plan - Offshore
Revision B
September 2024
2.3
Land plans (Onshore)
Revision G
July 2025
2.4
Special Category Land Plans
Revision D
June 2025
2.5
Works Plans - Onshore
Revision D
February 2025
2.6
Works plans - Offshore
Revision B
October 2024
2.7
Offshore Order Limits and Grid Coordinates Plan
Revision B
September2024
2.8
Street Works and Access Plan
Revision C
January 2025
2.9
Temporary closure of Public Rights of Way Plan
Revision D
February 2025
2.10
Tree Preservation Order and Hedgerow Plan
Revision B
September 2024
2.11
Historic Environment Plan - Onshore
Revision B
September2024
2.12
Historic Environment Plan - Offshore
Revision A
March 2024
2.13
Statutory or Non-Statutory Sites and Features of Nature Conservation -Onshore
Revision B
September2024
2.14
Statutory or Non-Statutory Sites and Features of Nature Conservation - Offshore
Revision A
March 2024
2.15
Water Bodies in a River Basin Management Plan
Revision B
October 2024
2.16
Crown Land Plan - Offshore
Revision A
March 2024
2.17
Crown Land Plan (Onshore)
Revision E
June2025
2.18
Temporary Speed Reduction Plan
Revision C
December 2024
4.1
Book of Reference
Revision H
July 2025
5.4.5
Lesser Black Backed Gull Habitats Regulation Assessment
Revision D
March 2025
5.5.6
Lesser Black-Backed Gull Implementation and Monitoring Plan
Revision E
August 2025
5.5.7
Kittiwake Implementation and Monitoring Plan
Revision F
October 2025
5.5.8
Guillemot and Razorbill Implementation and Monitoring Plan
Revision F
September 2025
8.1
Cable Statement
Revision A
March 2024
8.2
Safety Zone Statement
Revision A
March 2024
9.3
Offshore Project Design Principles
Revision A
March 2024
9.4
Onshore Substation Design Principles Document
Revision C
March 2025
9.12
Outline Cable Specification and Installation Plan
Revision D
March 2025
9.13
Margate and Long Sands SAC Benthic Mitigation Plan
Revision H
September 2025
9.14.1
Outline Marine Mammal Mitigation Protocol - Piling
Revision E
August 2025
9.14.2
Outline Marine Mammal Mitigation Protocol - UXO
Revision F
August 2025
9.15
Outline Southern North Sea Special Area of Conservation Site Integrity Plan
Revision B
February 2025
9.16
Outline Fisheries Liaison and Co-existence Plan
Revision D
February 2025
9.17
Outline Offshore Operations and Maintenance Plan
Revision A
March 2024
9.18
Outline Project Environmental Management Plan
Revision A
March 2024
9.18.1
Working in proximity to Wildlife in the Marine Environment
Revision C
August 2025
9.19
Outline Marine Written Schemes of Investigation
Revision C
December 2024
9.20
Outline Navigation and Installation Plan
Revision D
March 2025
9.21
Code of Construction Practice
Revision G
October 2025
9.22
Outline Landscape and Ecological Management Plan
Revision H
October 2025
9.23
Outline Onshore Written Scheme of Investigation
Revision B
March 2025
9.24
Outline Construction Traffic Management Plan
Revision F
March 2025
9.25
Outline Public Access Management Plan
Revision D
March 2025
9.26
Outline Workforce Travel Plan
Revision C
March 2024
9.27
Outline Skills and Employment Strategy
Revision A
March 2024
9.32
Offshore In-Principle Monitoring Plan
Revision I
October 2025
10.30
Outline Sediment Disposal Management Plan
Revision D
March 2025
10.47
Archaeological mitigation strategy
Revision B
March 2025
10.51
Deep Water Route Cable Installation Area (Future Dredging depths)
Version 3
February 2025
10.65
Outline groundwater monitoring plan
Revision A
March 2025
Environmental Statement
6.1.1
Introduction
Revision A
March 2024
6.1.2
Policy & Legislation
Revision A
March 2024
6.1.3
EIA Methodology
Revision A
March 2024
6.1.3.1
Cumulative Effects Assessment Methodology
Revision B
December 2024
6.1.3.2
Transboundary Screening
Revision A
March 2024
6.1.4
Site Selection and Alternatives
Revision A
March 2024
6.1.5
Non-Technical Summary
Revision A
March 2024
6.1.6
Scoping Report and Scoping Opinion
Revision A
March 2024
6.2.1
Offshore Project Description
Revision A
March 2024 (for avoidance of doubt because of a discrepancy of cover sheet showing 2023)
6.2.1.1
Detailed Offshore Project Design Envelope
Revision A
March 2024
6.2.2
Marine Geology, Oceanography and Physical processes
Revision A
March 2024
6.2.3
Marine Water and Sediment Quality
Revision A
March 2024
6.2.4
Offshore Ornithology
Revision A
March 2024
6.2.5
Benthic and Intertidal Ecology
Revision B
September 2025
6.2.6
Fish and Shellfish Ecology
Revision B
September 2025
6.2.7
Marine Mammal Ecology
Revision A
March 2024
6.2.8
Commercial Fisheries
Revision A
March 2024
6.2.9
Shipping and Navigation
Revision A
March 2024
6.2.10
Seascape, Landscape and Visual
Revision A
March 2024
6.2.11
Offshore Archaeology and Cultural Heritage
Revision A
March 2024
6.2.12
Infrastructure and Other Marine Users
Revision B
September 2024
6.2.13
Military and Civil Aviation
Revision A
March 2024
6.3.1
Onshore Project Description
Revision C
October 2024
6.3.2
Onshore Landscape and Visual Impact Assessment
Revision A
March 2024
6.3.3
Socio-Economic, Tourism and Recreation
Revision A
March 2024
6.3.4
Onshore Biodiversity and Nature Conservation
Revision B
September 2025
6.3.5
Ground Conditions and Land Use
Revision A
March 2024
6.3.6
Hydrology, Hydrogeology and Flood Risk
Revision A
March 2024
6.3.7
Archaeology and Cultural Heritage
Revision A
March 2024
6.3.8
Traffic and Transport
Revision D
March 2025
6.3.9
Airborne Noise and Vibration
Revision A
March 2024
6.3.10
Air Quality
Revision A
March 2024
6.4.1
Climate Change
Revision A
March 2024
6.4.1.1
Greenhouse Gas Assessment
Revision A
March 2024
6.4.2
Human Health and Major Disasters
Revision B
April 2024
6.4.3
Inter-Relationships
Revision A
March 2024
6.6.4.18
Onshore Biodiversity Net Gain Indicative Design Stage Report
Revision B
February 2025
6.8.1
Lesser Black Backed Gull Compensatory Areas Environmental Assessment
Revision C
December 2024
6.8.1.1
Lesser Black Backed Gull Compensatory Areas Flood Risk Assessment
Revision B
October 2024
6.8.1.2
Lesser Black Backed Gull Landscape and Visual Impact Assessment
Revision B
October 2024
6.8.1.3
Lesser Blacked Backed Gull Compensation Site - Ecological Impact Assessment
Revision C
December 2024
10.75
Supplementary Operations and Maintenance Assessment
Revision A
August 2025
10.76
Technical Memo on Revised Environment Agency Flood Mapping
Revision A
August 2025

---
Source: https://www.legislation.gov.uk/uksi/2025/1376/schedule/15 (the official version)
Page: https://openlegislation.uk/five-estuaries-offshore-wind-farm-order-2025/schedule-15
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.