  "url": "https://openlegislation.uk/five-estuaries-offshore-wind-farm-order-2025/schedule-9/paragraph-113/enacted",
  "json_url": "https://openlegislation.uk/five-estuaries-offshore-wind-farm-order-2025/schedule-9/paragraph-113/enacted.json",
  "legislation": "uksi/2025/1376",
  "legislation_title": "The Five Estuaries Offshore Wind Farm Order 2025",
  "legislation_url": "https://openlegislation.uk/five-estuaries-offshore-wind-farm-order-2025/enacted",
  "path": "schedule/9/paragraph/113",
  "kind": "paragraph",
  "number": "113",
  "heading": null,
  "text": "In this Part of this Schedule—\n“Area of Interest” means the area shown shaded in yellow on the Deep Water Route Cable Installation Area (Future Dredging depths) plan encompassing the Deep Water Routes;\n“cable burial risk assessment” means the cable burial risk assessment appended to the cable specification and installation plan;\n“cable specification and installation plan” means the cable specification and installation plan together with the cable burial risk assessment to be approved under condition 13(1)(g) of the deemed marine licence for the transmission assets in Schedule 11;\n“construction” includes execution, placing, altering, replacing, relaying, removal, renewal works of maintenance and decommissioning, in its application to a specified work which includes or comprises any operation, means the carrying out of that operation, and “construct” and “constructed” are to be construed accordingly;\n“commencement” for the purpose of this Part of this Schedule means the carrying out of any authorised development and monitoring activities;\n“Deep Water Routes” mean the Sunk and Trinity deep water routes;\n“installation” has the same meaning as construction and “installed” is to be construed accordingly;\n“maintain” has the same meaning as in article 2 (interpretation) save that it includes monitoring within the Area of Influence and “maintenance” shall be construed accordingly;\n“navigation and installation plan” means the navigation and installation plan to be approved under condition 13(1)(j) of the deemed marine licence for the transmission assets in Schedule 11;\n“PLA” means the Port of London Authority;\n“plans” includes navigational risk assessments, plans, sections, elevations, drawings, specifications, programmes, construction methods and descriptions including, where applicable, relevant hydraulic information as may be reasonably requested by the PLA; and\n“specified work” means Work No. 2(c), and any other part of the offshore works forming part of the authorised development (which for this purpose includes the maintenance and decommissioning of any part of the authorised development).",
  "extent": "E+W",
  "status": null,
  "version": "enacted",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 9 para. 113 in force at 8.1.2026, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1376/schedule/9/paragraph/113",
    "retrieved_at": "2026-10-28T21:07:51.328273+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}