# The Flood and Water Management Act 2010 (Commencement No. 7) Order 2012

S.I. 2012/2000 · made 30 July 2012 · revised to 30 July 2012

This Order brings into force provisions of the Flood and Water Management Act 2010 (“the Act”).

Made under: Flood and Water Management Act 2010 (Section 49)

PDFs: Printed copy https://openlegislation.uk/flood-and-water-management-act-2010-commencement-no-7-order-2012/pdf/uksi_20122000_en.pdf

## Introductory text

Coast Protection, England And Wales
Environmental Protection, England And Wales
Flood Risk Management, England And Wales
Water Industry, England And Wales
Made 30th July 2012
This Order is made—
(a) in relation to England, in exercise of the powers conferred on the Secretary of State by section 49(3)(h) of the Flood and Water Management Act 2010; and
(b) in relation to Wales, in exercise of the powers conferred on the Welsh Ministers by section 49(3)(i) of that Act.
The Secretary of State and the Welsh Ministers make the following Order.

## 1 Citation

This Order may be cited as the Flood and Water Management Act 2010 (Commencement No. 7) Order 2012.

## 2 Provisions coming into force on 1st August 2012

The following provisions of the Flood and Water Management Act 2010 come into force on 1st August 2012—
(a) section 30 (designation of features), so far as not already commenced; and
(b) Schedule 1 (risk management: designation of features) so far as not already commenced.

## Signature

Richard Benyon
Parliamentary Under Secretary of State
Department for Environment, Food and Rural Affairs
30th July 2012
John Griffiths
Minister for Environment and Sustainable Development
one of the Welsh Ministers
29th July 2012

## Explanatory note

(This note is not part of the Order)
This Order brings into force provisions of the Flood and Water Management Act 2010 (“the Act”).
Article 2 specifies provisions of the Act that come into force on 1 August 2012. These make provision for the designation of features for the purposes of flood and coastal erosion risk management. Under section 30 of, and Schedule 1 to, the Flood and Water Management Act 2010 (c. 29) (“the Act”), the Environment Agency, local authorities or an internal drainage board may designate structures or environmental features that affect a flood or coastal erosion risk, though they may not necessarily have been designed or constructed for that purpose. Once designated, the owner of the designated feature cannot alter, remove or replace it without consent from the relevant authority, being either the authority which designated the feature or the authority who has since taken over responsibility for the designation in accordance with Schedule 1 to the Act (the “Responsible Authority”). Under Schedule 1 the Responsible Authority also has powers to cancel a designation, grant, vary or withdraw consent (other than in response to an application) and issue enforcement notices in respect of designated features.
An impact assessment of the effect the provisions commenced by this Order will have on the costs of business and the voluntary sector has been produced, and copies are available from the website of the Department for Environment, Food and Rural Affairs at www.defra.gov.uk. It is published alongside this instrument at www.legislation.gov.uk.

---
Source: https://www.legislation.gov.uk/uksi/2012/2000 (the official version)
Page: https://openlegislation.uk/flood-and-water-management-act-2010-commencement-no-7-order-2012
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

