Paragraph 17
The operational procedures of the undertaker’s railway shall be so arranged that both sets of level crossing gates shall not be closed to road traffic at the same time.
The operational procedures of the undertaker’s railway shall be so arranged that both sets of level crossing gates shall not be closed to road traffic at the same time.