For the purposes of subsection (2) of section 6, the Director may determine as the relevant date a date which is—
(a) neither earlier than 1st January 1998, nor later than 31st December 1998;
(b) at least six months after—
(i) the date determined by him under paragraph (2) of article 3 above or, as the case may be, having effect in default of a determination under that paragraph; and
(ii) the Director’s proposal to determine a date for the purposes of that subsection is notified under article 5 below; and
(c) at least two months after the date on which his determination is made.

---