# The Gate Burton Energy Park Order 2024, Part 2: EXAMINATION DOCUMENTS FORMING PART OF THE ENVIRONMENTAL STATEMENT TO BE CERTIFIED

Extent: E+W

(1)
Document name
(2)
Document reference
(3)
Revision number
(4)
Date
(5)
Examination Library Reference
Figure 1-1: Scheme LocationEN010131/APP/3.2220 November 2023REP5-006
Figure 9-2: Fluvial Flood RiskEN010131/APP/3.2308 August 2023REP2-013
Figure 10-21: Vegetation Removal Plan EN010131/APP/3.2 CR403 October 2023CR1-003
Environmental Statement Chapter 5 – Environmental Impact Assessment MethodologyEN010131/APP/3.1203 October 2023REP4-006
Environmental Statement Chapter 8 – Ecology and Nature ConservationEN010131/APP/3.1203 October 2023REP4-008
Environmental Statement Chapter 10 – Landscape and visual amenityEN010131/APP/3.1 2 (dated August 2023, labelled Revision 1) 08 August 2023REP2-010
Environmental Statement Chapter 12 – Socio-Economics and Land UseEN010131/APP/3.1203 October 2023REP4-010
Environmental Statement Chapter 13 – Transport and AccessEN010131/APP/3.1203 October 2023REP4-012
Figure 2-5: Grid Connection Access Locations and Construction CompoundsEN010131/APP/3.2208 August 2023REP2-012
Figure 10-7: Areas of Great Landscape ValueEN010131/APP/3.2208 August 2023REP2-014
Figure 10-11: Viewpoint Locations on OS MappingEN010131/APP/3.2208 August 2023REP2-015
Figure 10-12: Viewpoint Locations on Aerial PhotographyEN010131/APP/3.2208 August 2023REP2-016
Figure 13-5: Walking and Cycling NetworkEN010131/APP/3.2 CR203 October 2023CR1-004
Figure 13-7: Public Rights of Way Management (Construction Phase)EN010131/APP/3.2 CR203 October 2023CR1-005
Appendix 2-B: Grid Connection Construction Method StatementEN010131/APP/3.3208 August 2023REP2-018
Appendix 7-E: Trial Trench Evaluation Fieldwork ReportEN010131/APP/3.3220 November 2023REP5-011
Appendix 13-E Part 1: Framework Construction Traffic Management PlanEN010131/APP/3.3 6 21 December 2023REP6-011
Appendix 13-E Part 2: Framework Construction Traffic Management PlanEN010131/APP/3.3 6 21 December 2023REP6-011a

---
Source: https://www.legislation.gov.uk/uksi/2024/807/schedule/12/part/2 (the official version)
Page: https://openlegislation.uk/gate-burton-energy-park-order-2024/schedule-12/part-2/enacted
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

