# The Gate Burton Energy Park Order 2024, Paragraph 1: Interpretation

Extent: E+W

In this Schedule—
“access rights” means rights over land to—
alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays, bridges and road widening and to remove impediments (including vegetation) to such access;
remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the authorised development;
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain security fencing, gates, boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary;
install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works; and
restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development;
“cable rights” means rights over land to—
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain electrical underground cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other ancillary apparatus and structures (including but not limited to access chambers, manholes and marker posts) and any other works necessary together with the right to fell, trim or lop trees and bushes which may obstruct or interfere with the said cables, telecommunications and other ancillary apparatus;
remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development;
continuous vertical and lateral support for the authorised development;
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain sewers, drains, pipes, ducts, mains, conduits, services, flues and to drain into and manage waterflows in any drains, watercourses and culverts;
install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding, landscaping and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs, hedgerows, landscaping and other ecological measures the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works;
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain security fencing, gates, boundary treatment, public rights of way and any other ancillary apparatus and any other works as necessary; and
restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove vegetation and restrict the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development;
“services rights” means rights over land to—
install, use, support, protect, inspect, alter, remove, replace, refurbish, reconstruct, retain, renew, improve and maintain sewers, drains, pipes, ducts, mains, conduits, services, flues and to drain into and manage waterflows in any drains, watercourses and culverts;
remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; and
restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development;
(1)
Plot reference number shown on the Land Plans
(2)
Purposes for which rights over land may be required and restrictive covenants imposed
1/3access rights
1/6cable rights
3/2cable rights
4/3access rights and services rights
4/4access rights and services rights
5/1access rights and services rights
5/2access rights and services rights
5/11cable rights
6/3cable rights
6/6cable rights
6/7cable rights
6/8cable rights
6/10cable rights
6/11cable rights
7/3access rights
7/6access rights
7/7access rights
9/1access rights and services rights
9/2access rights
9/3access rights and services rights
10/1access rights
10/2access rights and services rights
10/5cable rights
10/6cable rights
10/7cable rights
10/10access rights
10/15cable rights
11/1access rights
11/2access rights
11/3access rights
11/4access rights
11/5cable rights
11/6cable rights
11/7cable rights
11/8cable rights
12/1cable rights
12/2cable rights
12/3access rights
12/4cable rights
12/5access rights
12/6cable rights
12/7cable rights
12/8access rights
12/9cable rights
12/13access rights
12/14access rights
12/15access rights
12/16access rights
12/17access rights
12/18cable rights
12/19cable rights
12/20cable rights
12/21cable rights
12/22cable rights
12/23cable rights
12/24cable rights
12/25cable rights
13/1cable rights
13/2cable rights
13/3cable rights
13/4cable rights
13/5cable rights
13/6cable rights
13/7cable rights
13/8cable rights
14/1cable rights
14/2cable rights
14/3cable rights
14/4cable rights
14/5cable rights
14/6access rights
14/7cable rights
14/8cable rights
14/9cable rights
14/10access rights
14/11access rights
14/12access rights
14/13cable rights
14/14cable rights
14/15cable rights
14/16cable rights
14/17cable rights
14/18cable rights
14/19cable rights
14/20access rights
15/1access rights
15/2cable rights
15/3cable rights
15/4cable rights
15/5cable rights
15/6cable rights
15/8cable rights
15/9cable rights
15/10access rights
15/11cable rights
15/12cable rights
15/13cable rights
15/14access rights
16/1access rights
16/2access rights
16/3access rights
17/1cable rights
17/2cable rights
17/3cable rights
17/4cable rights
17/5cable rights
17/6cable rights
17/7cable rights
17/8cable rights
17/13access rights
17/14cable rights
17/15cable rights
17/16cable rights
17/17cable rights
17/18cable rights
17/19cable rights

---
Source: https://www.legislation.gov.uk/uksi/2024/807/schedule/9/paragraph/1 (the official version)
Page: https://openlegislation.uk/gate-burton-energy-park-order-2024/schedule-9/paragraph-1/enacted
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.