Article 9 Temporary use of land for construction of works
The undertaker may, in connection with the carrying out of the authorised works–
enter upon and take temporary possession, or for the purposes specified in column (1) of Schedule 2 to this Order, of the land specified in columns (2) and (3) of that Schedule; and
construct temporary works (including the provision of means of access) and buildings on the land.
Not less than 28 days before entering upon and taking temporary possession of land under this article the undertaker shall serve notice of the intended entry on the owners and occupiers of the land.
The undertaker may not, without the agreement of the owners of the land, remain in possession of any land under this article after the end of the period of one year beginning with the date of completion of the part of the authorised works for the purposes of which possession of the land is taken.
Before giving up possession of land of which temporary possession has been taken under this article, the undertaker shall remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land.
The undertaker shall pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the powers conferred by this article.
Any dispute as to a person’s entitlement to compensation under paragraph (5) above, or as to the amount of the compensation, shall be determined under Part I of the Land Compensation Act 1961.
Without prejudice to article 20 below, nothing in this article shall affect any liability to pay compensation under section 10(2) of the 1965 Act or under any other enactment in respect of loss or damage arising from the execution of any works, other than loss or damage for which compensation is payable under paragraph (5) above.
Where the undertaker takes possession of land under this article, it shall not be required to acquire the land or any interest in it.
The powers conferred by this article shall cease at the end of 5 years beginning on the day on which the Order comes into force but the undertaker may remain in possession of the land after the end of that period if the land was entered into and possession of it was taken before the end of that period.
In this article “building” includes any structure or other erection.