# The Gatwick Airport (Northern Runway Project) Development Consent Order 2025, Drainage

Extent: E+W

(m)construction of a new attenuation basin (Basin 3), with an approximate capacity of 600m3, with associated drainage facilities, access and landscaping located to the north of Longbridge Roundabout; and
(n)modification of the existing A23 Brighton Road Culvert located to the east of the River Mole.

---