{
  "url": "https://openlegislation.uk/gatwick-airport-northern-runway-project-development-consent-order-2025/schedule-1/crossheading-surface-access-works-highwaysn1",
  "json_url": "https://openlegislation.uk/gatwick-airport-northern-runway-project-development-consent-order-2025/schedule-1/crossheading-surface-access-works-highwaysn1.json",
  "legislation": "uksi/2025/1054",
  "legislation_title": "The Gatwick Airport (Northern Runway Project) Development Consent Order 2025",
  "legislation_url": "https://openlegislation.uk/gatwick-airport-northern-runway-project-development-consent-order-2025",
  "path": "schedule/1/crossheading/surface-access-works-highwaysn1",
  "kind": "crossheading",
  "number": null,
  "heading": "Highways",
  "text": "(a)widening and realignment of the existing A23 London Road between the Airport Way Bridge over A23 London Road and the new A23 London Road / North Terminal Link Signal-Controlled Junction, 545m long;\n(b)construction of a new signal-controlled junction (A23 London Road / North Terminal Link Signal-Controlled Junction) for the interface between A23 London Road and the new North Terminal Link;\n(c)widening and realignment of the existing A23 London Road between the new A23 London Road / North Terminal Link Signal-Controlled Junction and the A23 London Road bridge over the River Mole, 480m long, to include the provision of three lanes northbound between the North Terminal Flyover Link merge and the A23 London Road bridge over the River Mole;\n(d)realignment and widening of the existing Airport Way Westbound between the Airport Way Rail Bridge and the new North Terminal Flyover Link, 550m long, to include the provision of a third lane westbound;\n(e)realignment and reconfiguration of the existing diverge from A23 London Road to Airport Way Eastbound (A23 London Road Diverge to Airport Way Eastbound), 635m long;\n(f)construction of a new flyover link (North Terminal Flyover Link) over the North Terminal Roundabout between Airport Way Westbound and A23 London Road Northbound, 650m long;\n(g)construction of a new diverge from Airport Way Westbound to North Terminal Roundabout (Airport Way Diverge to North Terminal Roundabout), 425m long;\n(h)realignment and widening of the existing North Terminal Roundabout;\n(i)construction of a new left-in diverge from A23 London Road Northbound to North Terminal roundabout (A23 London Road Northbound Left-in Diverge to North Terminal Roundabout), 325m long;\n(j)construction of a new link road (North Terminal Link) from North Terminal Roundabout to a new signal-controlled junction on A23 London Road, 105m long;\n(k)realignment and widening of the existing Northway, 65m long;\n(l)realignment and widening of the existing Longbridge Way, 90m long;\n(m)realignment and widening of the existing Gatwick Way, 165m long;\n(n)realignment and widening of the existing Perimeter Road North, 270m long;\n(o)realignment and widening of the existing North Terminal Approach Road, 125m long;\n(p)construction of a new active travel path for pedestrians and cyclists between Longbridge Roundabout and North Terminal Roundabout including crossings of internal Gatwick Airport roads, 775m long;\n(q)construction of a new ramp connection for pedestrians and cyclists between A23 London Road and Riverside Garden Park, 120m long;",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1054/schedule/1/crossheading/surface-access-works-highwaysn1",
    "retrieved_at": "2026-10-28T21:11:10.827794+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}