# The Gatwick Airport (Northern Runway Project) Development Consent Order 2025, Part 3: NEW AND REALIGNED UNCLASSIFIED ROADS

Extent: E+W

(1)
Highway Authority
(2)
Extent of Street
Sheet 2A
Gatwick Airport Limited
The realigned Ring Road South between point 6a and point 6b as shown on Sheet 2A of the Traffic Regulation Measures – Classification of Roads Plans for a length of 85m.
Gatwick Airport Limited
The realigned Ring Road North between point 8a and point 8b as shown on Sheet 2A of the Traffic Regulation Measures – Classification of Roads Plans for a length of 80m.
Sheet 1A
Gatwick Airport Limited
The realigned North Terminal Roundabout Segregated Lane to North Terminal Approach between point 13b and point 14b as shown on Sheet 1A of the Traffic Regulation Measures – Classification of Roads Plans for a length of 70m.
Gatwick Airport Limited
The realigned Gatwick Way between point 15a and point 15b as shown on Sheet 1A of the Traffic Regulation Measures – Classification of Roads Plans for a length of 165m.
Gatwick Airport Limited
The realigned Perimeter Road North between point 16a and point 16b as shown on Sheet 1A of the Traffic Regulation Measures – Classification of Roads Plans for a length of 270m.
Gatwick Airport Limited
The realigned North Terminal Approach Road between point 17a and point 17b as shown on Sheet 1A of the Traffic Regulation Measures – Classification of Roads Plans for a length of 125m.
Gatwick Airport Limited
The realigned Northway between point 19a and point 19b as shown on Sheet 1A of the Traffic Regulation Measures – Classification of Roads Plans for a length of 65m.
Gatwick Airport Limited
The realigned Longbridge Way between point 20a and point 20b as shown on Sheet 1A of the Traffic Regulation Measures – Classification of Roads Plans for a length of 90m.
Gatwick Airport Limited
The realigned Car Park B access road between point 34a and point 34b as shown on Sheet 1A of the Traffic Regulation Measures – Classification of Roads Plans for a length of 125m

---
Source: https://www.legislation.gov.uk/uksi/2025/1054/schedule/5/part/3 (the official version)
Page: https://openlegislation.uk/gatwick-airport-northern-runway-project-development-consent-order-2025/schedule-5/part-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.