Article 2 Interpretation
In this Order—
-
“the authorised works” has the meaning given in article 3(2);
-
“the Council” means the Council of the Borough of Gosport;
-
“the deposited plan” and “the deposited section” mean respectively the plan and section comprising a single sheet prepared in duplicate, signed by the Head of Ports Division in the Department for Transport and marked “Plan and section referred to in The Gosport Borough Council (Ferry Works) Harbour Revision Order 2010” one copy of which is deposited at the Department for Transport’s offices and the other at the principal office of the Council;
-
“level of high water” means the level of mean high-water springs;
-
“the limits of deviation” means the limits of deviation shown on the deposited plan;
-
“tidal work” means so much of any work authorised by this Order as is on, under or over tidal waters or tidal lands below the level of high water;
-
“maintain” includes inspect, repair, adjust, alter, remove, reconstruct and replace and “maintenance” shall be construed accordingly;
-
“Queen’s Harbour Master” means the person appointed to be Queen’s Harbour Master of the Dockyard Port of Portsmouth under the Dockyard Ports Regulation Act 1865f1;
-
“Trinity House” means the Corporation of Trinity House of Deptford Strond.
Annotations
Footnotes
- f1