{
  "url": "https://openlegislation.uk/gosport-borough-council-forton-lake-opening-bridge-order-1999/article-4",
  "json_url": "https://openlegislation.uk/gosport-borough-council-forton-lake-opening-bridge-order-1999/article-4.json",
  "legislation": "uksi/1999/2400",
  "legislation_title": "The Gosport Borough Council (Forton Lake Opening Bridge) Order 1999",
  "legislation_url": "https://openlegislation.uk/gosport-borough-council-forton-lake-opening-bridge-order-1999",
  "path": "article/4",
  "kind": "article",
  "number": "4",
  "heading": "Power to deviate",
  "text": "In the construction or maintenance of the scheduled works, the Council may deviate laterally from the lines or situations shown on the deposited plans to any extent within the limits of deviation and may deviate vertically from the levels shown on the deposited sections to any extent not exceeding–\n(a) 3 metres upwards as to any part of the scheduled works,\n(b) 1 metre downwards as to the decking of the bridge, and\nto any extent downwards as to any other part of the scheduled works.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/1999/2400/article/4",
    "retrieved_at": "2026-10-29T09:59:39.620318+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}