# The Grampian Regional Council (Spey Abstraction Scheme) Water Order 1992

S.I. 1992/393 · made 25 February 1992

Made under: Water (Scotland) Act 1980 (Section 17, Section 29)

## Introductory text

WATER SUPPLY, SCOTLAND
Made 25th February 1992
Coming into force 3rd March 1992
The Secretary of State, in exercise of the powers conferred on him by sections 17(2) and 29(1) of the Water (Scotland) Act 1980 and of all other powers enabling him in that behalf, on the application of the Grampian Regional Council, hereby makes the following Order:

## 1 Citation and commencement

This Order may be cited as the Grampian Regional Council (Spey Abstraction Scheme) Water Order 1992 and shall come into force on 3rd March 1992.

## 2 Interpretation

In this Order—
“the Act” means the Water (Scotland) Act 1980;
“approved” means approved by the Secretary of State;
“the Council” means the Grampian Regional Council as water authority;
“day” means a period of 24 hours reckoned from midnight;
“deposited plans” means the two plans, prepared in duplicate, docqueted and signed as relative to this Order and marked, “The Grampian Regional Council (Spey Abstraction Scheme) Water Order 1992 Plan of Works” and “The Grampian Regional Council (Spey Abstraction Scheme) Water Order 1992 Part of Work No 1: Proposed Wellhead Chamber, Work No 2: Control Building Incorporating Recording Apparatus for Approved Gauges at Work No 4, Work No 3: Control Building, Work No 4: Chamber containing Approved Gauges” one copy of each of which is deposited in the Scottish Office, New St Andrew’s House, Edinburgh, and the other in the office of the Chief Executive of the Council at Aberdeen;
“gauge” includes a gauge weir or other apparatus for measuring the flow of water;
“undertaking” means the water undertaking for the time being of the Council;
“works” means the works described in Schedule 1 to this Order which the Council, in exercise of the powers conferred on them by section 21 of the Act, and in the lines and situations and according to the levels shown on the deposited plans, propose to construct and maintain for the purpose of providing a supply of water when they have acquired the necessary lands or sufficient rights therein.

## 3 Incorporation and application of provisions of Schedule 4 to the Act

The provisions of sections 2 and 10(3) and (4) of Schedule 4 to the Act, modified and adapted to read as set out in Schedule 2 to this Order, shall apply to the undertaking in so far as affected by the provisions of this Order, and the terms used in those provisions as so modified and adapted, which are defined in this Order, shall have the same meaning as in this Order.

## 4 Water rights

Subject to the provisions of this Order, the Council may, for the purposes of the undertaking and by means of the Wellfield (Work No 1) take water from the gravels adjacent to the river known as the River Spey in the Moray District of the Grampian Region.

## 5 Water rights

(1) During the construction of the works the Council may take from the gravels adjacent to the said River Spey such water as they may require for such construction.
(2) After the completion of the works the Council shall not take from the said gravels adjacent to the River Spey a quantity of water greater than 27,000 cubic metres in any one day as measured through or over approved gauges (part of Work No 4).

## 6 Water rights

If the power to take water conferred by this Order has not been exercised within ten years from the date on which this Order comes into force the said power shall cease.

## 7 Miscellaneous

The Council shall at all times after the expiration of six months from the date on which this Order comes into force keep at the office of the Chief Executive of the Council a copy thereof and a copy of each of the deposited plans.

## Signature

T. D. Macdonald
Deputy Chief Engineer, Scottish Office
The Scottish Office Environment Department,
27 Perth Street,
Edinburgh
25th February 1992

## Schedule 1 

The works referred to in this Order and shown on the deposited plans marked “The Grampian Regional Council (Spey Abstraction Scheme) Water Order 1992 Plan of Works” and “The Grampian Regional Council (Spey Abstraction Scheme) Water Order 1992 Part of Work No 1: Proposed Wellhead Chamber, Work No 2: Control Building Incorporating Recording Apparatus for Approved Gauges at Work No 4, Work No 3: Control Building, Work No 4: Chamber containing Approved Gauges” are—
Work No 1
A wellfield comprising up to 36 wells situated adjacent to the west bank of the River Spey between Ordnance Survey Grid Reference NJ 3325 5706 and NJ 3389 5939.
Work No 2
A control building incorporating recording apparatus for approved gauges at Work No 4 to indicate the quantity of water abstracted, situated at Ordnance Survey Grid Reference NJ 3344 5845.
Work No 3
A control building, situated at Ordnance Survey Grid Reference NJ 3336 5760.
Work No 4
A chamber containing approved gauges to measure the quantity of water abstracted, situated at Ordnance Survey Grid Reference NJ 3349 5813.

## Schedule 2 

The provisions of Schedule 4 to the Act referred to in, and as modified and adapted for the purposes of, this Order are—

---
Source: https://www.legislation.gov.uk/uksi/1992/393 (the official version)
Page: https://openlegislation.uk/grampian-regional-council-spey-abstraction-scheme-water-order-1992
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.