  "url": "https://openlegislation.uk/greater-manchester-light-rapid-transit-system-act-1994/section-4",
  "json_url": "https://openlegislation.uk/greater-manchester-light-rapid-transit-system-act-1994/section-4.json",
  "legislation": "ukla/1994/6",
  "legislation_title": "Greater Manchester (Light Rapid Transit System) Act 1994",
  "legislation_url": "https://openlegislation.uk/greater-manchester-light-rapid-transit-system-act-1994",
  "path": "section/4",
  "kind": "section",
  "number": "4",
  "heading": "Power to make works",
  "text": "(1) Subject to the provisions of this Act, the Executive may make and maintain the works in the borough referred to in this section (together with all necessary works and conveniences connected therewith) in the lines or situations and according to the levels following (that is to say):—\n(a) as regards the substituted portion of Work No. 5, the line or situation delineated on the substituted plan and the level shown on the substituted section; and\n(b) as regards the remainder of the works hereafter in this section described (except the portion of Work No. 5 for which the substituted portion of that work is substituted), the lines or situations delineated on the deposited plans and the levels shown on the deposited sections.\n(2) The works referred to in subsection (1) above are as follows:—\nWork No. 1 A tramroad 1,307 yards (1,196 metres) in length (double line) commencing by a junction with the Hollinwood Branch Railway of the railways board at reference point SD91300 04762 and terminating at reference point SD92047 04796;\nWork No. 2 A tramroad 272 yards (249 metres) in length (double line), partly in tunnel, commencing at the termination of Work No. 1 and terminating at reference point SD92274 04774;\nWork No. 3 A tramroad 95 yards (87 metres) in length (double line) commencing at the termination of Work No. 2 and terminating at reference point SD92363 04771;\nWork No. 4 A tramway 951 yards (870 metres) in length (double line) commencing at the termination of Work No. 3 and terminating at reference point SD93181 05059;\nWork No. 5 A tramroad 291 yards (266 metres) in length (double line) commencing at the termination of Work No. 4 and terminating by a junction with the Middleton Junction to Rochdale Railway of the railways board at reference point SD93395 05178;\nThe substituted portion of Work No. 5;\nWork No. 6 A pedestrian footpath and subway 55 yards (50 metres) in length commencing at reference point SD91955 04798 and terminating at reference point SD92004 04788;\nWork No. 7 A pedestrian footpath and subway 33 yards (30 metres) in length commencing at reference point SD93323 05116 and terminating at reference point SD93346 05136;\nWork No. 8 A widening of Cromwell Street 117 yards (107 metres) in length commencing at reference point SD92615 04733 and terminating at reference point SD92720 04764;\nWork No. 9 A widening of Clegg Street 11 yards (10 metres) in length commencing at reference point SD92741 04863 and terminating at reference point SD92746 04871.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukla/1994/6/section/4",
    "retrieved_at": "2026-10-29T14:46:12.890229+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}