# The Greater Manchester (Light Rapid Transit System) (Ashton-under-Lyne Extension) Order 1998, Part I: STREETS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED


(1)
(2)
(3)
(4)
Area
Street to be stopped up
Extent of stopping up
New street to be substituted
City of Manchester
Sheffield Street
Between SS1 and SS2
Work No. 1B between SU1 and SU2.
Munday Street
Between SS7 and SS8 at entry to Pollard Street
Work No. 1F between SU3 and SU4.
Frost Street
Between SS17 at entry to Merrill Street and SS18 at entry to Beswick Street
Work No. 2B between SU9 and SU10.
Holt Town
Between SS19 and SS20 at entry to Ashton New Road
Work No. 3A between SU11 and SU12.
Holt Town
Between SS25 and SS26 at entry to Holt Town Industrial Estate
Work No. 5A between ES7 and ES8.
Borough of Tameside
John Street
Between SS35 and SS36 at entry to Manchester Road
Work No. 9A between SU13 and SU14.

---
Source: https://www.legislation.gov.uk/uksi/1998/1936/schedule/4/part/I (the official version)
Page: https://openlegislation.uk/greater-manchester-light-rapid-transit-system-ashton-under-lyne-extension-order-1998/schedule-4/part-I
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

