# The Greater Manchester (Light Rapid Transit System) (Modification) Order 1994, Article 2: Substitution of fixed bridge for opening bridge in description of Work No. 1


Notwithstanding that the bridge over the Manchester Ship Canal forming part of Work No.1 of the Greater Manchester (Light Rapid Transit System) Act 1990 is described in section 4 of that Act and referred to in the substituted section deposited for the purposes of that Act as having an opening span, it may be made and maintained with a fixed span.

---
Source: https://www.legislation.gov.uk/uksi/1994/701/article/2 (the official version)
Page: https://openlegislation.uk/greater-manchester-light-rapid-transit-system-modification-order-1994/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

