# The Greater Manchester (Light Rapid Transit System) (Trafford Depot) Order 2002, Article 16: Mode of construction and operation of transit system


(1) The transit system comprised in the authorised works shall be operated by electricity or, in an emergency or for the purposes of maintenance, by diesel power or other means.
(2) The transit system shall be constructed on a gauge of 1,435 millimetres.

---
Source: https://www.legislation.gov.uk/uksi/2002/1327/article/16 (the official version)
Page: https://openlegislation.uk/greater-manchester-light-rapid-transit-system-trafford-depot-order-2002/article-16
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

