{
  "url": "https://openlegislation.uk/greater-manchester-light-rapid-transit-system-trafford-depot-order-2002/schedule-1",
  "json_url": "https://openlegislation.uk/greater-manchester-light-rapid-transit-system-trafford-depot-order-2002/schedule-1.json",
  "legislation": "uksi/2002/1327",
  "legislation_title": "The Greater Manchester (Light Rapid Transit System) (Trafford Depot) Order 2002",
  "legislation_url": "https://openlegislation.uk/greater-manchester-light-rapid-transit-system-trafford-depot-order-2002",
  "path": "schedule/1",
  "kind": "schedule",
  "number": "1",
  "heading": "SCHEDULED WORKS",
  "text": "A servicing and maintenance depot in the Borough of Trafford including—\nWork No. 1—\nA tramroad 170 metres in length (single line) commencing at a junction with the Metrolink Altrincham Line 150 metres south west of the Trafford Bar Stop running in a south westerly direction before terminating at a point on Elsinore Road 345 metres south west of Skerton Road.\nWork No. 2—\nA tramroad 128 metres in length (single line) commencing at a junction with the Metrolink Airport Line at chainage 150 metres in Work No. 1 of the Greater Manchester (Light Rapid Transit System) (Airport Extension) Order 1997 running in a south westerly direction before terminating at a point on Elsinore Road 260 metres south west of Skerton Road.\nWork No. 3—\nA tramroad 80 metres in length (single line) commencing at a junction with the Metrolink Altrincham Line 97 metres north east of Old Trafford Stop subway running in a north easterly direction before terminating at a point on Elsinore Road 160 metres north east of Ayres Road.\nWork No. 4—\nA tramroad 159 metres in length (single line) commencing at a junction with the Metrolink Airport Line at chainage 138 metres in Work No. 2 of the Greater Manchester (Light Rapid Transit System) (Airport Extension) Order 1997 running in a northerly direction before terminating at a point 160 metres north of Ayres Road and at chainage 180 metres in Work No. 5.\nWork No. 5—\nA tramroad 968 metres in length (single line with multiple sidings) commencing at a point 40 metres south west of where Elsinore Road crosses a dismantled railway line and extending around the site joining with Works No’s 1, 3, 4 and 6 before terminating at a point 95 metres south of the commencement point.\nWork No. 6—\nA tramroad 245 metres in length (single line) commencing at a junction with chainage point 623 metres of Work No. 5 running in a north easterly direction before terminating at a junction with chainage point 850 metres of Work No. 5.\nKey to Schedules 2 and 3\nSS\nStopping up of street\nW\nKerb line modification\nTC\nTraffic calming modification",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "S.I. 1997/1266."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2002/1327/schedule/1",
    "retrieved_at": "2026-10-29T06:57:21.916484+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}