# The Greater Manchester (Light Rapid Transit System) (Trafford Depot) Order 2002, Schedule 1: SCHEDULED WORKS


A servicing and maintenance depot in the Borough of Trafford including—
Work No. 1—
A tramroad 170 metres in length (single line) commencing at a junction with the Metrolink Altrincham Line 150 metres south west of the Trafford Bar Stop running in a south westerly direction before terminating at a point on Elsinore Road 345 metres south west of Skerton Road.
Work No. 2—
A tramroad 128 metres in length (single line) commencing at a junction with the Metrolink Airport Line at chainage 150 metres in Work No. 1 of the Greater Manchester (Light Rapid Transit System) (Airport Extension) Order 1997 running in a south westerly direction before terminating at a point on Elsinore Road 260 metres south west of Skerton Road.
Work No. 3—
A tramroad 80 metres in length (single line) commencing at a junction with the Metrolink Altrincham Line 97 metres north east of Old Trafford Stop subway running in a north easterly direction before terminating at a point on Elsinore Road 160 metres north east of Ayres Road.
Work No. 4—
A tramroad 159 metres in length (single line) commencing at a junction with the Metrolink Airport Line at chainage 138 metres in Work No. 2 of the Greater Manchester (Light Rapid Transit System) (Airport Extension) Order 1997 running in a northerly direction before terminating at a point 160 metres north of Ayres Road and at chainage 180 metres in Work No. 5.
Work No. 5—
A tramroad 968 metres in length (single line with multiple sidings) commencing at a point 40 metres south west of where Elsinore Road crosses a dismantled railway line and extending around the site joining with Works No’s 1, 3, 4 and 6 before terminating at a point 95 metres south of the commencement point.
Work No. 6—
A tramroad 245 metres in length (single line) commencing at a junction with chainage point 623 metres of Work No. 5 running in a north easterly direction before terminating at a junction with chainage point 850 metres of Work No. 5.
Key to Schedules 2 and 3
SS
Stopping up of street
W
Kerb line modification
TC
Traffic calming modification

---
Source: https://www.legislation.gov.uk/uksi/2002/1327/schedule/1 (the official version)
Page: https://openlegislation.uk/greater-manchester-light-rapid-transit-system-trafford-depot-order-2002/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.