Article 24 Annex VI amended (minimum content of monitoring methodology plan)
(1)
Annex VI is amended as follows.
(2)
In the fourth bullet point under paragraph (d) of point 1 after “based on NACE rev. 2 or PRODCOM” insert “, and for the 2027-2030 allocation period identifying which sub-installations are UK CBAM sub-installations and which are not UK CBAM sub-installations”.