# The Gunfleet Sands Offshore Wind Farm Order 2004, Paragraph 1


The works which the undertaker is authorised to construct and maintain by article 3(1) are the following works on the bed of the North Sea adjoining the coast at Clacton-on-Sea in the district of Tendring, county of Essex—
(a) up to 30 wind turbine generators fixed to the seabed by up to four piles for each wind turbine and extending to a height of up to 130.5 metres above the level of high water, fitted with rotating blades with a diameter of up to 110 metres and situated at the following reference points—
Wind turbine number
Reference Point Easting
Reference Point Northing
1
620259
208141
2
621150
206647
3
620937
207023
4
620717
207392
5
620497
207763
6
620992
208646
7
623927
210669
8
624814
209182
9
624591
209553
10
624371
209924
11
624151
210297
12
623193
210164
13
624080
208675
14
623860
209044
15
623641
209415
16
623419
209783
17
622459
209658
18
623346
208168
19
623125
208539
20
622906
208911
21
622682
209283
22
621726
209152
23
622614
207660
24
622393
208032
25
622174
208404
26
621951
208777
27
621881
207154
28
621663
207525
29
621442
207894
30
621222
208261
(b) a substation at reference point 622794E, 209097N with a height of 42 metres above the level of high water and a span of 24 metres (accommodating transformers, switch gear, back-up generators and other technical installations);
(c) a network of cables buried under the seabed connecting the wind turbines to the substation, to run in direct lines as follows—
between the wind turbines numbered 2, 3, 4, 5, 1, 6, 22, 17, 21 and the substation,
between the wind turbines numbered 28, 29, 30 and 6,
between the wind turbines numbered 27, 23, 24, 25, 26 and 21,
between the wind turbines numbered 18, 19, 20 and the substation,
between the wind turbines numbered 13, 14, 15, 16, 12 and 17, and
between the wind turbines numbered 8, 9, 10, 11, 7 and 12;
(d) a cable buried at a depth of 3 metres below the level of the seabed connecting the substation to the shore, commencing by a connection with that substation then proceeding in a north-north-westerly direction until it reaches the shore at Holland-on-Sea at reference point 621460E, 216855N.

---
Source: https://www.legislation.gov.uk/uksi/2004/933/schedule/paragraph/1 (the official version)
Page: https://openlegislation.uk/gunfleet-sands-offshore-wind-farm-order-2004/schedule/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.