# The Harwich Parkeston Quay Harbour Revision Order 2010, Article 13: Preferred vessels

Extent: E+W+S

(1) During the period of one year commencing with the date when Works Nos. 3, 4 and 5 have been substantially completed the Company shall provide moorings within the boat harbour for preferred vessels.
(2) Subject to paragraph (3), in this article “preferred vessels” means the vessels designated as such during the period mentioned in paragraph (1) by the bodies specified in the first column of the following table, being vessels which shall not exceed the number specified in the second column of that table and which shall not exceed the length specified in the third column of that table—
Designating body
Maximum number of vessels which may be designated
Maximum length of designated vessels
Harwich and Dovercourt
Sailing Club
(a) 36 vessels
(b) 20 vessels
(c) 4 vessels
8 metres
10 metres
12 metres
Harwich Fishermen’s
Association
(a) 10 vessels
(b) 8 vessels
10 metres
12 metres
Harwich Small Boat Owners
Association
18 vessels
12 metres
(3) The vessel referred to in paragraph (2)(c) of article 11 shall, for the purposes of this article be a preferred vessel and shall continue to be such after the expiry of the period mentioned in paragraph (1) so long as it is—
(a) used as the clubhouse of the Harwich and Dovercourt Sailing Club; and
(b) permanently moored in the manner specified in paragraph (2)(c) of article 11.
(4) The Company may levy on a preferred vessel any of the charges leviable by or under any of the provisions of the Act.

---
Source: https://www.legislation.gov.uk/uksi/2010/626/article/13 (the official version)
Page: https://openlegislation.uk/harwich-parkeston-quay-harbour-revision-order-2010/article-13
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

