# The Heathrow Express Railway Extension Order 2002, Article 4: Power to construct works


(1) The undertaker may construct and maintain the scheduled works.
(2) Subject to article 5 below, the scheduled works shall be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections.
(3) The undertaker may, within the limits of deviation, carry out and maintain such of the following works as may be necessary or expedient for the purposes of, in connection with or in consequence of, the construction of the scheduled works, namely—
(a) works to alter the position of apparatus, including mains, sewers, drains and cables;
(b) works to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses;
(c) landscaping and other works to mitigate any adverse effects of the construction, maintenance or operation of the scheduled works;
(d) works for the benefit or protection of premises affected by the scheduled works; and
(e) such other works of whatever nature, including emergency escape shafts and air ventilation shafts, as may be necessary or expedient.
(4) The undertaker may on or in any part of the lands numbered on the deposited plans 45, 46 and 47 make and maintain, in connection with the scheduled works, a railway station together with all such works as may be necessary or expedient for the purposes of, in connection with, or in consequence of, the construction of the station.

---
Source: https://www.legislation.gov.uk/uksi/2002/1064/article/4 (the official version)
Page: https://openlegislation.uk/heathrow-express-railway-extension-order-2002/article-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.