OpenLegislation

Schedule 1 SCHEDULED WORKS

Original text. Later amendments are not shown.

In the London Borough of Hillingdon—

  • Work No. 1A—A railway (2,280 metres in length in tunnel) commencing by a junction with Work No. 5 (in tunnel) authorised by the Heathrow Express Railway Act 1991 at a point, at chainage 45 metres from the commencement of that work, and terminating beneath a point 23 metres east of the Western Perimeter Road.

  • Work No. 1B—A railway (2,425 metres in length in tunnel) commencing by a junction with Work No. 4 (in tunnel) authorised by the Heathrow Express Railway Act 1991 at a point, at chainage 1,530 metres from the commencement of that work, and terminating beneath a point 55 metres east of the Western Perimeter Road.