Paragraph 3
The nationally significant infrastructure project comprises a generating station with a gross electrical output of over 50 megawatts alternating current comprising all or any of the work numbers in this Schedule or any part of any work number in this Schedule—
Work No. 1 – a ground mounted solar photovoltaic generating station comprising—
solar panels fitted to mounting structures;
balance of solar plant,
and associated development within the meaning of Section 115(2) of the 2008 Act comprising—
Work No. 2 – a battery energy storage system comprising—
battery energy storage system units;
auxiliary transformers and associated bunding;
power conversion system units including inverters, switchgear, transformers and ancillary equipment;
containers or enclosures housing all or any of Work No. 2(b) and (c) and ancillary equipment sitting on a concrete foundation on a gravel sub-base;
monitoring and control systems;
heating, ventilation and air conditioning systems;
fire safety infrastructure including water storage in tanks or other containers, drainage and water containment features, bunding and associated infrastructure; and
containers or similar structures to house control room, office and welfare facilities, and storage.
Work No. 3 – works in connection with an onsite substation comprising—
substation, switch room buildings, concrete foundations and ancillary equipment including reactive power units;
power conversion system units including inverters, switchgear, transformers and ancillary equipment;
control building housing offices, storage containers and space, welfare facilities, waste storage within a fenced compound, car parking;
monitoring and control systems;
132 kilovolt harmonic filter compound;
electrical cables;
deluge system including water tanks and fire suppression, and drainage and water containment features and associated infrastructure; and
access gates and tracks, security palisade fencing and bunding.
Work No. 4 – works including—
electrical cables up to 33 kilovolt connecting Work No. 1 and Work No. 2 to Work No. 3;
electrical cables up to 132 kilovolt connecting Work No. 3 to Work No. 6;
fencing, gates, boundary treatment and other means of enclosure;
improvement, maintenance and use of existing private tracks;
laying down of internal access tracks, ramps, means of access, footpaths, permissive paths, roads, including the laying and construction of drainage infrastructure, signage and information boards;
works for the provision of security and monitoring measures such as closed circuit television security system (CCTV), columns, lighting, cameras, weather stations, communications infrastructure, and perimeter fencing;
landscaping and biodiversity mitigation and enhancement measures including planting; and
works required for crossing, moving, re-routing or over/undergrounding of existing utility assets (including water, gas, sewer pipes, electricity distribution/transmission cabling, telecommunications etc.).
Work No. 4A – works including—
electrical cables up to 33 kilovolt connecting Work No. 1 and Work No. 2 to Work No. 3;
fencing, gates, boundary treatment and other means of enclosure;
laying down of internal access tracks, ramps, means of access, footpaths, roads, including the laying and construction of drainage infrastructure, signage and information boards; and
works required for crossing, moving, re-routing or over/undergrounding of existing utility assets (including water, gas, sewer pipes, electricity distribution/transmission cabling, telecommunications etc.).
Work No. 5 – works including—
electrical cables up to 132 kilovolt connecting Work No. 3 to Work No. 6;
fencing, gates, boundary treatment and other means of enclosure;
laying down of internal access tracks, ramps, means of access, footpaths, roads, including the laying and construction of drainage infrastructure, signage and information boards; and
works required for crossing, moving, re-routing or over/undergrounding of existing utility assets (including water, gas, sewer pipes, electricity distribution/transmission cabling, telecommunications etc.).
Work No. 6 – within the NGET substation construction of electrical substation infrastructure including—
a compound for electrical works necessary for the onwards transmission of electricity containing, but not limited to, cable switchgear and electrical equipment including power transformers, reactive compensation equipment, filters, cooling equipment, control and welfare buildings, lightning rods, internal roads, security fencing, and other associated equipment, structures and buildings including noise-attenuation works;
electrical cables; and
132 kilovolt connection bay located at the NGET Drax 132kV Substation including all associated electrical equipment and civil works necessary to enable the onward transmission of electricity.
Work No. 6A – access to the NGET substation for the construction, operation, maintenance and decommissioning of Work No. 6.
Work No. 7 – temporary construction compounds comprising—
works to excavate and store soil, clear vegetation and obstacles, level, shape and prepare surface for construction compounds to be installed, and civils investigations and works to reinforce ground with weight-bearing support infrastructure;
creation of temporary construction compounds, laydown and working areas;
storage of equipment and materials including waste skips;
areas of hardstanding, car parking, site and welfare offices, canteens and workshops, area for download and turning, security infrastructure, site drainage and waste management infrastructure, and electricity, water, waste-water and telecommunications connections; and
works required for crossing, moving, re-routing or over/undergrounding of existing utility assets (including water, gas, sewer pipes, electricity distribution/transmission cabling, telecommunications etc.).
Work No. 8 – works to facilitate access for all works, comprising—
creation of accesses from or across the public highway;
visibility splays;
works to widen and surface the public highway; and
installation of temporary traffic lights or facilities for manned traffic management.
Work No. 8A – works including—
electrical cables up to 132 kilovolt connecting Work No. 3 to Work No. 6;
works required for crossing the railway using trenchless installation techniques; and
works required for crossing, moving, re-routing or over/undergrounding of existing utility assets (including water, gas, sewer pipes, electricity distribution/transmission cabling, telecommunications etc.).
Work No. 9 – works for areas of green infrastructure comprising—
soft landscaping and planting, including tree and hedgerow planting;
habitat creation management including earthworks, landscaping, means of enclosure and the laying and construction of drainage infrastructure; and
laying down of permissive paths, signage and information boards.
In connection with the construction of Work Nos. 1 to 9 above and to the extent that they do not form any part of any such work, further associated development comprising such other works as may be necessary or expedient for the purpose of or in connection with the relevant part of the authorised development and which fall within the scope of work assessed by the environmental statement within the Order limits including—
roads, ramps, watercourse and other temporary crossings, vehicular and pedestrian means of access including creation of temporary accesses, new tracks and paths, widening upgrades alterations and improvements of existing roads tracks and paths (including the installation of temporary traffic lights, visibility splays, banksmen or other measures to manage traffic);
fencing, gates, boundary treatments and other means of enclosure;
bunds, embankments, trenching and swales;
provision of temporary and permanent ecological and environmental mitigation and compensation works, including landscaping works and habitat creation;
working sites in connection with the construction of the authorised development including construction lay down areas, compounds, and spoil storage and associated control measures;
works to the existing irrigation system and works to alter the position and extent of such irrigation system;
surface water drainage systems, storm water attenuation systems including storage basins, oil water separators, including channelling and culverting and works to existing drainage networks;
electrical, gas, water, foul water drainage and telecommunications infrastructure connections diversions and works to alter the position of such services and utilities connections;
works to alter the course of or otherwise interfere with non-navigable rivers, streams or watercourses, and the temporary closure of watercourses for installation of culverts, drainage and other features to cross watercourses;
site establishments and preparation works including site clearance (including vegetation removal, demolition of existing buildings and structure), earthworks (including soil stripping and storage and site levelling) and excavations, the alteration of the position of services and utilities and works for the protection of buildings and land;
works for the benefit or protection of land affected by authorised development;
works of restoration;
tunnelling, boring and drilling works; and
such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development.