# The Helios Renewable Energy Project Order 2025, Paragraph 72


In this Part of this Schedule—
“alternative apparatus” means alternative apparatus adequate to enable NPG to fulfil its statutory functions in a manner not less efficient than previously;
“apparatus” means electric lines or electrical plant (as defined in the Electricity Act 1989) belonging to or maintained by NPG and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
“authorised works” means so much of the works authorised by this Order which affect existing NPG’s apparatus within the Order limits;
“functions” includes powers and duties;
“in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
“plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed and shall include measures proposed by the undertaker to ensure the grant of sufficient land or rights in land necessary to mitigate the impacts of the works on NPG’s undertaking within the Order Limits; and
“NPG” means Northern Powergrid (Yorkshire) PLC (Company Number 04112320) whose registered address is Lloyds Court, 78 Grey Street, Newcastle upon Tyne, NE1 6AF.

---
Source: https://www.legislation.gov.uk/uksi/2025/1372/schedule/9/paragraph/72 (the official version)
Page: https://openlegislation.uk/helios-renewable-energy-project-order-2025/schedule-9/paragraph-72
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.