{
  "url": "https://openlegislation.uk/high-speed-rail-london-west-midlands-act-2017/schedule-5/paragraph-wrapper3n1",
  "json_url": "https://openlegislation.uk/high-speed-rail-london-west-midlands-act-2017/schedule-5/paragraph-wrapper3n1.json",
  "legislation": "ukpga/2017/7",
  "legislation_title": "High Speed Rail (London - West Midlands) Act 2017",
  "legislation_url": "https://openlegislation.uk/high-speed-rail-london-west-midlands-act-2017",
  "path": "schedule/5/paragraph/wrapper3n1",
  "kind": "paragraph",
  "number": null,
  "heading": null,
  "text": "The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table.\nArea\nNumber of land shown on deposited plans\nPurpose for which land may be acquired or used\nLondon Borough of Camden\n4, 13, 79a, 99\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n68, 69, 93, 162, 163, 236, 369, 401 to 411, 508, 522, 665, 704, 721, 724, 727, 750, 791, 792, 794 to 796, 801 to 805, 807 to 811, 901, 912, 978, 1017, 1051\nDiversion or installation of, or works to, utilities apparatus\n78, 110, 816, 817, 819, 820, 822, 829, 834, 847, 848, 849, 852, 854, 855, 856, AP3-22\nProvision of worksite and access for construction\n140a, 142\nProvision of worksite and access for construction\nDiversion or installation of, or works to utilities apparatus\nInstallation of ground anchors\n90, 151 to 154, 157, 159, 177, 180, 181\nInstallation of ground anchors\n363\nProvision of electricity supply system and access\n434\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nAP3-5\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nLondon Borough of Brent\n28, 29, 48, 50, 55, 58, 78, 87, 185, 374, AP4-13 to AP4-15\nDiversion or installation of, or works to, utilities apparatus\n53a, 54a, AP4-6, AP4-10\nProvision of worksite and access for construction\nRoyal Borough of Kensington & Chelsea\n1 to 3\nProvision of worksite and access for construction\nProvision and renewal of railway systems for operational purposes and drainage\n16, 19\nDiversion or installation of, or works to, utilities apparatus\nLondon Borough of Hammersmith & Fulham\n5, 6, 50c, 67, AP4-3, AP4-7, AP4-9 to AP4-11\nProvision of worksite and access for construction\n12, 13, 21a, 22c, 22e, 28, 29, 37, 48, 50a, 50b, 63, 66, 71, 73, 75, 76\nDiversion or installation of, or works to, utilities apparatus\n77\nProvision of environmental mitigation\nAP4-1\nProvision of worksite and access for construction and maintenance\nLondon Borough of Ealing\n5, 7, 8, 9, 12, 13, 29, 30, 118a, 120a, 124a, 124b, 132, 156, 223, 229, 233, 265, 562, 787a, 788 to 790, 946 to 949\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n20, 21, 35, 36, 40, 41, 44, 45, 48, 49, 52, 53, 56, 57, 60, 61, 64, 65, 68, 69, 72, 73, 76, 77, 80, 81, 84, 125a, 125b, 126, 127a, 127b, 142 to 144, 145a, 152 to 154, 155a, 155b, 190, 193, 194, 196, 200, 202, 204 to 206, 209, 214, 216 to 219, 221, 222, 228, 231, 232, 235, 237, 240, 242, 251, 254 to 257, 259, 267, 269, 271, 272, 274, 277, 282 to 289, 438, 439, AP2-13, AP2-15, AP2-17, AP2-21, AP4-8, AP4-10, AP4-16, AP4-17\nProvision of worksite and access for construction\n103, 106\nProvision of worksite and access for construction\nProvision and renewal of railway systems for operational purposes and drainage\nDiversion or installation of, or works to, utilities apparatus\n119, 121, 150, 151, 157, 158, 165\nProvision of worksite and access for construction\nReinstatement of businesses or facilities\nDiversion or installation of, or works to, utilities apparatus\n133 to 139, 295, 297, 298, 314, 315, 322 to 324, 396, 406, 408, 445, 456 to 461, 471, 579, 580, 716, 770, 771, 798, 799, 805 to 807, 842 to 844, 849, 867, 898, 922, 925, 926, 942, 944, 945, 957 to 964, 973 to 975, 977, 985, 987, AP2-25, AP2-26\nDiversion or installation of, or works to, utilities apparatus\n213\nProvision and renewal of railway systems for operational purposes and drainage\n454\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nAP4-1\nReinstatement of businesses or facilities\nLondon Borough of Hillingdon\n1 to 16, 26 to 28, 39, 40, 68, 84, 85, 106, 107, 128 to 139, 175, 176, 190, 202, 203, 219, 224, 229 to 239, 371, 384, 387, 390, 447, 449, 452, 454, 463a, 464a, 476, 477, 478a, 492a, 522, 523, 523a, AP5-1b, AP5-2 to AP5-14\nDiversion or installation of, or works to, utilities apparatus\n25, 441, 442, 458, 459, 469, 471, 483a, 484, 485, 494 to 496, 537, AP4-20, AP4-25, AP4-27 to AP4-29, AP4-33 to AP4-39\nProvision of environmental mitigation\n25a, 470, 494b\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n50, 51\nProvision of access for construction and maintenance of utility diversions\n101 to 103, 420, 422, 423, 426, 427 to 429, 466a, 467, 482, 487, 488, 502, 504, 506, AP4-12, AP4-13, AP4-15, AP4-16\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n377, 379, 411, 414, 415, 535\nProvision of worksite and access for construction\n412, 413, 416 to 419, AP4-26\nProvision of worksite and access for construction and maintenance\n424, 425, 460, 536, 540, AP4-17 to AP4-19\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n465a, 511\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n474\nProvision of worksite and access for construction and maintenance\nProvision of environmental mitigation\n496a, 498, 499, 526 to 534\nProvision of worksite and access for construction and maintenance\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n501, 507\nDiversion and installation of overhead electric lines\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n510, AP4-21\nProvision of worksite and access for construction\nProvision of environmental mitigation\n545\nDiversion and installation of overhead electric lines\nProvision of worksite and access for construction and maintenance\n548, 550, 556 to 558, 563, AP2-1\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n562\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n564, 590b, AP2-3, AP2-4\nDiversion and installation of overhead electric lines\n606, 614, 615, 618\nProvision of worksite and access for construction and maintenance\nProvision and renewal of railway systems for operational purposes and drainage\nProvision of new public right of way\nDiversion and installation of overhead electric lines\nDiversion or installation of, or works to, utilities apparatus\n611, 613\nProvision of worksite and access for construction and maintenance\nProvision and renewal of railway systems for operational purposes and drainage\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\n612\nProvision of worksite and access for construction and maintenance\nProvision and renewal of railway systems for operational purposes and drainage\nDiversion or installation of, or works to, utilities apparatus\n616\nProvision of worksite and access for construction and maintenance\nProvision and renewal of railway systems for operational purposes and drainage\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n496, 654, 655\nProvision of environmental mitigation\nProvision of flood mitigation measures\n496a, 498\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion and installation of overhead electric lines\n557, 560, 561, 570 to 580, 583, 584, 588, 590, 591, 593, 594, 707, 714, 719, 720c\nDiversion and installation of overhead electric lines\n558\nProvision of worksite and access for construction and maintenance\nDiversion and installation of overhead electric lines\n565\nDiversion and installation of overhead electric lines\nProvision of electricity supply system and access\n566 to 568\nProvision of access for construction and maintenance of utility diversions\nProvision of electricity supply system and access\n603, 604, 643 to 645, 657 to 659, 665, 683, 693, 694, 698a, 720d, 723, 724, 728, 729, 736, 737, 739, 741, 742, 748, 749, 753, 767, 768, 770, 784, 786, 787, 789\nProvision of environmental mitigation\n621\nProvision of balancing pond and associated works and access for maintenance\nProvision of electricity supply system and access\nProvision of new public right of way\n622, 624, 625, 627, 628, 630 to 632, 636, 666, 669, 671, 738\nDiversion or installation of, or works to, utilities apparatus\n633, 676, 677, 679, 697, 741a, 747, 747a, 747b, 747d, 756, 756a, 761, 762a, 763 to 765, 771, 772, 774 to 778, 780 to 783\nProvision of worksite and access for construction and maintenance\n642, 758\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n663, 672\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n692\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nProvision of electricity supply system and access\nProvision of flood mitigation measures\nProvision of new public right of way\nDiversion and installation of overhead electric lines\n726, 731, 734, 740, 745, 746\nProvision of worksite and access for construction\n751, 755\nProvision of worksite and access for construction and maintenance\nProvision of environmental mitigation\n759\nProvision of worksite and access for construction and maintenance\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nAP2-5, AP2-6\nProvision of access for construction and maintenance\nAP4-40 to AP4-42\nReinstatement of businesses or facilities\nCounty of Buckinghamshire, District of South Bucks,Parish of Iver\nAP2-1, AP2-3\nProvision and renewal of railway systems for operational purposes and drainage\nAP2-9 to AP2-11, AP2-14, AP2-15\nProvision of worksite and access for construction\nBorough of Slough\nAP2-3, AP2-5, AP2-6, AP2-14, AP2-21, AP2-25, AP2-30, AP2-33, AP2-34\nProvision of worksite and access for construction\nAP2-12, AP2-26\nProvision and renewal of railway systems for operational purposes and drainage\nAP2-13, AP2-20\nProvision of worksite and access for construction\nProvision and renewal of railway systems for operational purposes and drainage\nAP2-17, AP2-22, AP2-23, AP2-28\nProvision of worksite and access for construction\nProvision of flood mitigation measures\nAP2-35\nProvision of access for construction and maintenance of utility diversions\nAP2-37\nDiversion or installation of, or works to, utilities apparatus\nCounty of Buckinghamshire District of South Bucks Parish of Denham\n1, 2\nProvision of flood mitigation measures\n1d, 1f\nDiversion and installation of overhead electric lines\n11, 17, 19, 32\nProvision of environmental mitigation\n25, 26, 28 to 31, 33, 46, 52\nProvision of worksite and access for construction\n14, 15, 23, 27\nProvision of balancing pond and associated works and access for maintenance\n26\nProvision of worksite and access for construction\n34\nProvision of environmental mitigation\nProvision of worksite and access for construction\n42, 43\nDiversion or installation of, or works to, utilities apparatus\n37 to 39, 47 to 49, AP2-3\nProvision of access for construction and maintenance\nAP4-1, AP4-2, AP4-4 to AP4-9\nProvision of worksite and access for construction\nProvision of drainage and associated works\nParish of Wexham\nAP4-1\nProvision of environmental mitigation\nCounty of Hertfordshire District of Three Rivers\n5\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\n7, 13, 15, 17, 19, 21, 22, 24, 25, 27, 31, 38, 41, 44, 48, 54, 58, 65, 69, 104\nProvision of worksite and access for construction\n12\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n23, 53, 80\nProvision of balancing pond and associated works and access for maintenance\n32, 36, 37\nProvision of worksite and access for construction\nProvision of drainage and associated works\n40, 46, 61, 63, 64\nProvision of drainage and associated works\n49, 55, 80a, 84, 94, 97, 120, AP4-1 to AP4-17\nProvision of environmental mitigation\n75\nProvision of environmental mitigation\nProvision of worksite and access for construction\n107, 109\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of electricity supply system and access\nDiversion and installation of overhead electric lines\n116\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n10\nDiversion or installation of, or works to, utilities apparatus\nAP4-18\nReinstatement of businesses or facilities\nCounty of Buckinghamshire District of Chiltern Parish of Chalfont St Peter\n1, 7, 21, 30, 31, 35\nProvision of worksite and access for construction\n16\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n19\nDiversion and installation of overhead electric lines\n70, 75, 76, 83, 85\nProvision of environmental mitigation\nParish of Chalfont St Giles\n4 to 6\nProvision of environmental mitigation\n131\nProvision of worksite and access for construction\n134, 135, 139, 141, 142, 147\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nParish of Amersham\n7, 22, 24, 28, 34, 37\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction and maintenance\n10\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n27\nDiversion or installation of, or works to, utilities apparatus\n31\nProvision of environmental mitigation\nProvision of worksite and access for construction\n59, 66, 67, 74, 76, 77\nProvision of protective works to watercourse\nParish of Coleshill\n4\nProvision of environmental mitigation\n8\nDiversion or installation of, or works to, utilities apparatus\nParish of Little Missenden\n2 to 4\nProvision of protective works to watercourse\n11, 16\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n14\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction and maintenance\n15, 17, 19, 20\nDiversion or installation of, or works to, utilities apparatus\nAP2-2, AP2-3\nProvision of new public right of way\nParish of Great Missenden\n142, 158, 174, 178, AP4-55, AP4-56\nProvision of environmental mitigation\n135 to 137\nProvision of drainage and associated works\n155, 184\nProvision of environmental mitigation\nProvision of drainage and associated works\nAP4-80, AP4-81\nProvision of environmental mitigation\nProvision of new public right of way\n170, 171\nProvision of environmental mitigation\nProvision of worksite and access for construction\nAP4-31, AP4-38, AP4-41, AP4-41a, AP4-42 to AP4-44, AP4-47a, AP4-48, AP4-49, AP4-59, AP4-73, AP4-74\nDiversion and installation of overhead electric lines\n173, 179, 188, 189\nDiversion or installation of, or works to, utilities apparatus\n112, 117\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\nDiversion or installation of, or works to, utilities apparatus\n157, 159 to 161, 163, 167, AP4-15\nProvision of worksite and access for construction\n128, 139\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n138, 147\nDiversion and installation of overhead electric lines\n166\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion and installation of overhead electric lines\n162a, 162b\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n180, AP4-51, AP4-52, AP4-75\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\nAP2-2\nProvision of balancing pond and associated works and access for maintenance\nAP4-54, AP4-78\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nAP4-57\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion and installation of overhead electric lines\nProvision of new public right of way\nAP4-58, AP4-69, AP4-70\nProvision of worksite and access for construction and maintenance\nProvision of drainage and associated works\nAP4-65\nProvision of balancing pond and associated works and access for maintenance\nAP4-67\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\nAP4-68\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion and installation of overhead electric lines\nParish of The Lee\n2, 42 to 45\nProvision of environmental mitigation\n5, 22, 24, 28, 34\nReprofiling of ground\n8, 9, 26\nProvision of worksite and access for construction\nReprofiling of ground\n11, 12, 18, 19, 31\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n16\nDiversion and installation of overhead electric lines\n27\nProvision of environmental mitigation\nReprofiling of ground\nDiversion or installation of, or works to, utilities apparatus\n32\nProvision of environmental mitigation\nReprofiling of ground\n36\nReprofiling of ground\nProvision of worksite and access for construction and maintenance\n39, 40\nProvision of environmental mitigation\nProvision of worksite and access for construction\nAP2-1\nProvision of access for construction\nDistrict of Aylesbury Vale Parish of Wendover\n1, 3, 14, 48, 150, 153, 233\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n5, 8, 15, 19, 59, 66 to 71, 74, 76 to 78, 80, 81, 123, 143, 147, 220\nProvision of drainage and associated works\n7, 251a\nProvision of environmental mitigation\nProvision of drainage and associated works\n9, 11, 23, 25, 50, 57, 65, 97, 98, 127, 129, 132, 146, 222, 232, 236, 238, 239, 243, 248, 250a, 257\nProvision of environmental mitigation\n18, 42, 45, 46, 60, 120, 126, 149, 151, 182, 187, 190, 192, 224\nProvision of worksite and access for construction\n24\nProvision of drainage and associated works\nDiversion or installation of, or works to, utilities apparatus\n29\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n31\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nProvision of drainage and associated works\n32, 58, 108, 109, 142, 212, 214, 223, 241\nDiversion and installation of overhead electric lines\n34, 55, 94, 124, 204\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\nProvision of worksite and access for construction\n35, 169, 172, 185, 205, 206\nDiversion or installation of, or works to, utilities apparatus\n38 to 41, 52, 96, 103, 110, 111\nProvision of environmental mitigation\nProvision of worksite and access for construction\n47, 56, 62, 63, 165, 211, 235\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n54\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n61, 221\nProvision of worksite and access for construction\nProvision of drainage and associated works\n64\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\nProvision of drainage and associated works\n91, 213, 215\nProvision of drainage and associated works\nDiversion or installation of, or works to, utilities apparatus\n95\nProvision of worksite and access for construction and maintenance\n100\nProvision of environmental mitigation\nProvision of drainage and associated works\nDiversion and installation of overhead electric lines\n135, 136\nProvision of balancing pond and associated works and access for maintenance\nDiversion and installation of overhead electric lines\n156, 159, 217\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n171\nProvision of worksite and access for construction\nProvision of new public right of way\n173\nInstallation of ground anchors\n203\nProvision of worksite and access for construction\nProvision of new public right of way\nDiversion and installation of overhead electric lines\n219\nProvision of worksite and access for construction\nProvision of environmental mitigation\nProvision of drainage and associated works\nDiversion and installation of overhead electric lines\n230\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\nAP1-11\nProvision of environmental mitigation\nProvision of worksite and access for construction and provision of balancing pond and associated works\nAccess for maintenance\nAP2-1\nProvision of balancing pond and associated works and access for maintenance\nAP2-3a\nMinor highway alterations\nAP2-4\nReinstatement of businesses or facilities\nDistrict of Wycombe Parish of Ellesborough\n2\nProvision of drainage and associated works\nDiversion or installation of, or works to, utilities apparatus\n4, 15, 74\nProvision of worksite and access for construction\n5\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\n10\nProvision of environmental mitigation\nProvision of drainage and associated works\n13, 17, 32, 33\nDiversion or installation of, or works to, utilities apparatus\n34, 44, 66, 70\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n22, 23, 30, 35, 36, 38, 41, 47, 48, AP2-1, AP2-2\nProvision of environmental mitigation\n50, 51, 54 to 57\nProvision of flood mitigation measures\n52\nProvision of worksite and access for construction and maintenance\n53, 61 to 64, 71, 72\nProvision of drainage and associated works\n69, 80\nDiversion and installation of overhead electric lines\n11, 12\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nAP4-1\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDistrict of Aylesbury Vale Parish of Stoke Mandeville\n4, 21, 23, 26, 33, 34, 38, 81, 90, 100 to 102, 108, 112, 155, 157, 158, 161\nProvision of environmental mitigation\n6, 69, 113\nProvision of worksite and access for construction and maintenance\n8, 9, 94, 95, 120\nProvision of flood mitigation measures\n10\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n18\nProvision of worksite and access for construction and maintenance\nProvision of new public right of way\n22, 48, 56, 122, 132, 144\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n24, 59, 63, 116, 149, 151\nProvision of worksite and access for construction\n25, 72, 75, 76, 78 to 80, 87, 88, 91, 98, 109, 117, 138, 141\nDiversion or installation of, or works to, utilities apparatus\n28\nProvision of balancing pond and associated works and access for maintenance\n43, 84, 103, 129\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n61\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n62\nProvision of drainage and associated works\n74, 92, 93, 152\nProvision of drainage and associated works\nProvision of environmental mitigation\n83, AP2-2\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\nProvision of environmental mitigation\n118\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n119\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\n123, 131, 134, AP1-3, AP1-4, 150\nProvision of environmental mitigation\nProvision of worksite and access for construction\n126\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\nDiversion or installation of, or works to, utilities apparatus\n146\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction and maintenance\nDistrict of Wycombe Parish of Great and Little Kimble cum Marsh\n1\nProvision of drainage and associated works\n3, 7, 9\nProvision of worksite and access for construction\nDistrict of Aylesbury Parish of Stone with Bishopstone and Hartwell\n6, 65, 86\nDiversion or installation of, or works to, utilities apparatus\n17, 18, 23, 32\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n27, 29, 30, 37, 69, 79, 81\nProvision of environmental mitigation\n28, 28b\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\n33\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of drainage and associated works\nProvision of worksite and access for construction\n35\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n36\nProvision of environmental mitigation\nProvision of access for construction and maintenance\n39\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of drainage and associated works\nProvision of access for construction and maintenance\n40\nProvision of worksite and access for construction and maintenance\n44, 46, 53, 57, 59\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n45\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction and maintenance\n47\nProvision of worksite and access for construction\nProvision of a turning head\n48, 85, 90\nProvision of worksite and access for construction\n51, 55\nProvision of worksite and access for construction\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n60\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nProvision of a turning head\n61, 72\nProvision of environmental mitigation\nProvision of worksite and access for construction\n66a, 66b, 71b, 73b\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of flood mitigation measures\n74a, 75, 89\nProvision of flood mitigation measures\n76a\nProvision of environmental mitigation\nProvision of drainage and associated works\n87\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of flood mitigation measures\n88\nProvision of flood mitigation measures\nProvision of drainage and associated works\nAP4-2\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\nParish of Aylesbury\n1\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n6, 18\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n20 to 22, 24\nProvision of environmental mitigation\nParish of Coldharbour\n2 to 7, 10, 11\nProvision of environmental mitigation\nParish of Fleet Marston\n4\nProvision of worksite and access for construction and maintenance\n5, 11\nProvision of environmental mitigation\nProvision of drainage and associated works\nDiversion or installation of, or works to, utilities apparatus\n6, 7\nDiversion or installation of, or works to, utilities apparatus\n8, 9\nProvision of flood mitigation measures\n10\nProvision of worksite and access for construction\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n13, 26\nProvision of environmental mitigation\n14, 18, 30\nProvision of drainage and associated works\n15, 21\nProvision of worksite and access for construction\n16, 19\nProvision of environmental mitigation\nProvision of new public right of way\n20\nProvision of environmental mitigation\nProvision of worksite and access for construction\n23\nProvision of worksite and access for construction\nProvision of drainage and associated works\n25\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n12b\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nParish of Waddesdon\n1, 16\nProvision of flood mitigation measures\n2, 73, 79\nProvision of environmental mitigation\nProvision of new public right of way\n3, 32, 45, 107, 128, 129\nProvision of drainage and associated works\n6\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of new public right of way\n7, 9, 113, 120, 126, 127\nProvision of environmental mitigation\nProvision of worksite and access for construction\n8, 10, 11, 13, 34, 36, 41, 42, 49, 51, 53, 59, 60, 67, 69, 74, 76, 81 to 83, 85, 100, 103\nProvision of environmental mitigation\n17, 46, 52, 56, 66, 72, 78, 84, 106, 114\nProvision of worksite and access for construction\n18\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of electricity supply system and access\n31, 54, 109, 112\nProvision of worksite and access for construction and maintenance\n33, 40, 58\nProvision of balancing pond and associated works and access for maintenance\n68, 93, 110, 111\nDiversion or installation of, or works to, utilities apparatus\n91\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\n94\nProvision of new public right of way\n97\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n105\nProvision of drainage and associated works\nProvision of worksite and access for construction and maintenance\n123\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of flood mitigation measures\nParish of Quainton\n3, 35, 61, 66\nProvision of environmental mitigation\nProvision of flood mitigation measures\n8, 23, 59, 74, 88, 115, AP2-5, AP2-14, AP2-15, AP4-1, AP4-2\nProvision of balancing pond and associated works and access for maintenance\n9, 12, 14, 24, 92, 98 to 100, 133, 138, 142, 177, 182, 191, 194, 199, 203, 216, 218, 248 to 250\nProvision of worksite and access for construction\n11, 20, 27, 53, 56, 58, 62, 64, 65, 122, 125, 128, 141, 195a, 206a, 222, 223, 225, 226, 232, 240, 253, 270, 271, 273a, AP1-23, AP1-24\nProvision of environmental mitigation\n17, 75, 127, 210, 212\nDiversion or installation of, or works to, utilities apparatus\n19\nProvision of worksite and access for construction\nRemoval of utility apparatus\n21\nProvision of environmental mitigation\nProvision of worksite and access for construction\nRemoval of utility apparatus\n31\nProvision of balancing pond and associated works and access for maintenance\nRemoval of utility apparatus\n32, 50, 68, 151, 219, 220, 224\nProvision of flood mitigation measures\n33, 72\nProvision of worksite and access for construction and maintenance\n87\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n54, 71, 89, 104, 110, 113, 118b, 118d, AP1-5, AP1-16 to AP1-20\nProvision of environmental mitigation\nProvision of worksite and access for construction\n38\nProvision of environmental mitigation\nProvision of diversion or installation of, or works to, utilities apparatus\n40\nProvision of environmental mitigation\nProvision of drainage and associated works\n46, 107, 109, 131, 146, 149, 159, 197, 244, AP2-3, AP2-4, AP2-10\nProvision of drainage and associated works\n47\nProvision of a turning head\nProvision of environmental mitigation\n49\nProvision of a turning head\nDiversion or installation of, or works to, utilities apparatus\n93\nProvision of balancing pond and associated works and access for maintenance\nProvision of flood mitigation measures\n118c, 176\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n124\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\n135, 150, 155, 157, 158, 161, 164, 168, 170, 184a, 233\nDiversion and installation of overhead electric lines\n136a\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nProvision of new public right of way\nProvision of electricity supply system and access\n143\nDiversion and installation of overhead electric lines\nProvision of access for construction and maintenance\n160\nProvision of access for construction and maintenance\n166\nProvision of electricity supply system and access\n173\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\nProvision of drainage and associated works\n174, 175\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n204\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of flood mitigation measures\n206b, 207a\nProvision of environmental mitigation\nProvision of electricity supply system and access\n243\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\n251\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nAP2-6, AP2-7 to AP2-9\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\nParish of Grendon Underwood\n3, 5, 10, 28, 30\nProvision of environmental mitigation\n20, 23, 26\nProvision of worksite and access for construction\n4\nProvision of environmental mitigation\nProvision of drainage and associated works\n21 and 24\nProvision of environmental mitigation\nProvision of worksite and access for construction\n12a\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nAP2-6\nProvision of worksite and access for construction and maintenance\nProvision of new public right of way\n16a\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nProvision of new public right of way\n29\nProvision of balancing pond and associated works and access for maintenance\nAP1-1, AP1-5, AP1-6, AP1-9\nDiversion and installation of overhead electric lines\nParish of Middle Claydon\n1, 2\nProvision of environmental mitigation\nParish of East Claydon\n4, 4a, 5, 7\nDiversion and installation of overhead electric lines\nParish of Calvert Green\n1, 9, 11\nProvision of environmental mitigation\n2\nProvision of environmental mitigation\nProvision of new public right of way\nAP2-1\nProvision of new public right of way\n6\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of flood mitigation measures\nProvision of new public right of way\n8\nProvision of flood mitigation measures\n23\nDiversion or installation of, or works to, utilities apparatus\n24\nDiversion or installation of, or works to, utilities apparatus\nProvision of access for construction and maintenance\n25\nProvision of worksite and access for construction\n18a\nProvision of access for construction and maintenance\nProvision of new public right of way\nAP4-2\nProvision of access for construction\nAP4-6\nProvision of balancing pond and associated works and access for maintenance\nParish of Steeple Claydon\n3, 4, 6, 78, 80, 110, 111, AP1-1, AP4-1, AP4-4\nProvision of environmental mitigation\n24, 26a, 27, 31, 33, 97\nProvision of worksite and access for construction\n72\nProvision of environmental mitigation\nProvision of access for construction and maintenance\n9c, 9d\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of access for construction and maintenance\n9a, 100, 117, 119, 120\nDiversion or installation of, or works to, utilities apparatus\n21\nProvision of worksite and access for construction\nProvision of balancing pond and associated works and access for maintenance\n52a, 76\nProvision of environmental mitigation\nProvision of worksite and access for construction\n51a\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\n75\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n98, 99, 112\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n109\nProvision of flood mitigation measures\n124, 125\nProvision of drainage and associated works\n69, 71\nProvision of new public right of way\n102, 103, AP1-8, AP2-1 to AP2-4\nProvision of worksite and access for construction and maintenance\nParish of Charndon\n2, 3\nDiversion or installation of, or works to, utilities apparatus\nParish of Twyford\n5, 6, 13, 62, 67, 92, 101\nProvision of worksite and access for construction\n14\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nProvision of new public right of way\n24, 26, 44, 49, 54\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n27, 48\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\n38, 60, 81, 82, 89, 90\nProvision of flood mitigation measures\n39\nProvision of balancing pond and associated works and access for maintenance\nProvision of worksite and access for construction\n47, 63, 64, 69\nProvision of environmental mitigation\nProvision of worksite and access for construction\n52\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of access for construction and maintenance\n53, 76\nProvision of worksite and access for construction and maintenance\n58, 88\nProvision of environmental mitigation\nProvision of new public right of way\n71, 75, 77, 83, 84, 95, 97, 99, 100\nProvision of environmental mitigation\n72\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\n78\nProvision of drainage and associated works\n80\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\n87\nDiversion or installation of, or works to, utilities apparatus\n91\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n94\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of access for construction and maintenance\nProvision of new public right of way\nParish of Preston Bissett\n1 to 4\nProvision of flood mitigation measures\n6, 13, 22, 27, 30, 31, 44, 45, 54 to 56, 58, 62, AP2-1\nProvision of environmental mitigation\n8, 15a, 16b, 28a, 29a, 52\nProvision of worksite and access for construction\n12a, 12b, AP4-1\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\n20, 21\nProvision of environmental mitigation\nProvision of drainage and associated works\n23a\nProvision of environmental mitigation\nProvision of new public right of way\nProvision of drainage and associated works\nProvision of worksite and access for construction and maintenance\n37\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of worksite and access for construction and maintenance\n16c, 16d, 18b, 41, 47 to 51\nProvision of environmental mitigation\nProvision of worksite and access for construction\n40, 42, 43, 61\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nCounty of Oxfordshire District of Cherwell Parish of Godington\n5a, 5b, 12, AP2-1\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n6a\nProvision of worksite and access for construction\n8a, 8b, 14, 15\nProvision of flood mitigation measures\nCounty of Buckinghamshire District of Aylesbury Vale Parish of Chetwode\n1 to 3, 8, 9\nProvision of flood mitigation measures\n5, 12 to 14, 22 to 24, 28, 31, 35, 42, 45, 52, 53, 55, 64, 84, 87\nProvision of environmental mitigation\n17a, 17b, 17c, 17d\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\nProvision of drainage and associated works\n19 to 21, 95, 96\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n25, 27, 34, 91\nProvision of worksite and access for construction\n30\nProvision of environmental mitigation\nProvision of drainage and associated works\n41, 86, 88\nDiversion or installation of, or works to, utilities apparatus\n51\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n54\nProvision of drainage and associated works\nRemoval of utility apparatus\n63\nProvision of drainage and associated works\n65\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\n71, 90\nProvision of environmental mitigation\nProvision of new public right of way\n76\nProvision of worksite and access for construction\nRemoval of utility apparatus\nParish of Barton Hartshorn\n2a, AP2-5\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n6a\nProvision of environmental mitigation\n7a, 16\nProvision of worksite and access for construction\n9, 10, 22\nProvision of flood mitigation measures\n13\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n14\nProvision of worksite and access for construction\nProvision of drainage and associated works\n19, 24\nProvision of drainage and associated works\n25, 26\nProvision of environmental mitigation\nProvision of new public right of way\nCounty of Oxfordshire District of Cherwell Parish of Newton Purcell with Shelswell\n1, 8, 17, 39, 49, 66\nProvision of environmental mitigation\nProvision of worksite and access for construction\n4, 6, 15, 16, 19, 23, 31, 34, 36, 46, 54, 86\nProvision of environmental mitigation\n10, 22, 27, 55, 69, 75, 82, 83\nProvision of worksite and access for construction\n21, 26, 63, 67, 74, 76\nProvision of drainage and associated works\n32\nDiversion or installation of, or works to, utilities apparatus\nRemoval of utility apparatus\nProvision of worksite and access for construction\n37, 59\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n30, 56, 58\nProvision of worksite and access for construction and maintenance\n57, 62\nProvision of flood mitigation measures\nProvision of drainage and associated works\n61\nProvision of worksite and access for construction and maintenance\nProvision of new public right of way\n64\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\n72\nProvision of worksite and access for construction\nProvision of flood mitigation measures\n85, 88\nDiversion or installation of, or works to, utilities apparatus\n92\nProvision of worksite and access for construction\nProvision of new public right of way\nParish of Finmere\n5, 9, 54\nProvision of environmental mitigation\n7, 15\nProvision of environmental mitigation\nProvision of new public right of way\n8, 12\nProvision of environmental mitigation\nProvision of worksite and access for construction\n24, 33, 36, 37\nProvision of worksite and access for construction\n18\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n18a, 25, 40, 42\nDiversion or installation of, or works to, utilities apparatus\n48\nProvision of access for utility works\n52\nProvision of environmental mitigation\nRemoval of utility apparatus\nParish of Mixbury\n7, 24, 26, 40\nDiversion or installation of, or works to, utilities apparatus\n8, 13a\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n12, 17a, 45, 46, 57, AP2-8 to AP2-11\nProvision of environmental mitigation\n15a, 18, AP2-5a\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n34, 43a, 43b, 51\nProvision of worksite and access for construction\n28a, 37, 38\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n31\nProvision of balancing pond and associated works and access for maintenance\nProvision of electricity supply system and access\n31a\nProvision of environmental mitigation\nRemoval of utility apparatus\nDiversion or installation of, or works to, utilities apparatus\n39\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n40b, 40c, 49\nProvision of environmental mitigation\nProvision of worksite and access for construction\n41a, 63\nProvision of drainage and associated works\n48\nProvision of environmental mitigation\nProvision of new public right of way\n53, 54\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\nProvision of drainage and associated works\n52\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\nProvision of drainage and associated works\nRemoval of utility apparatus\n62\nProvision of flood mitigation measures\nRemoval of utility apparatus\n66\nRemoval of utility apparatus\nCounty of Buckinghamshire District of Aylesbury Vale Parish of Westbury\n1\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nRemoval of utility apparatus\nProvision of drainage and associated works\n1a\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nProvision of new public right of way\n5, 6\nProvision of drainage and associated works\n7\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of new public right of way\nProvision of worksite and access for construction and maintenance\n14\nProvision of flood mitigation measures\n19, 21 to 25, 27\nProvision of environmental mitigation\n28\nProvision of environmental mitigation\nProvision of new public right of way\n29\nProvision of worksite and access for construction\nProvision of new public right of way\n30, 33 to 35, 38\nProvision of worksite and access for construction\n18, 20\nDiversion or installation of, or works to, utilities apparatus\nParish of Turweston\n3, 4, 45, 46\nProvision of new public right of way\n11\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n8, 13a, 20, 27, 50, 68, 71, 72, 76 to 79, 83, 85, 99, 100\nProvision of worksite and access for construction\n18, 21, 89, 91\nProvision of environmental mitigation\n29\nDiversion or installation of, or works to, utilities apparatus\n62, 73\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\nRemoval of utility apparatus\n81\nProvision of worksite and access for construction and maintenance\n37\nDiversion and installation of overhead electric lines\n38, 104, 106\nProvision of environmental mitigation\nProvision of worksite and access for construction\n40, 57\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n42, 61, 67\nDiversion and installation of overhead electric lines\n43, 48\nDiversion and installation of overhead electric lines\nProvision of new public right of way\n49\nProvision of worksite and access for construction\nProvision of new public right of way\n65\nProvision of worksite and access for construction\nRemoval of utility apparatus\nProvision of balancing pond and associated works and access for maintenance\n84\nProvision of worksite and access for construction\nProvision of balancing pond and associated works and access for maintenance\n88\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n90\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of balancing pond and associated works and access for maintenance\n102, 110\nProvision of drainage and associated works\n109\nProvision of environmental mitigation\nProvision of flood mitigation measures\nAP2-1 to AP2-4\nReinstatement of businesses or facilities\nCounty of Northamptonshire District of South Northamptonshire Parish of Whitfield\n1\nProvision of balancing pond and associated works and access for maintenance\nDiversion and installation of overhead electric lines\n4, 9, 13, 14\nProvision of drainage and associated works\n6\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\nProvision of worksite and access for construction\nProvision of drainage and associated works\nProvision of electricity supply system, and access\n10\nProvision of environmental mitigation\nProvision of flood mitigation measures\nProvision of new public rights of way\nProvision of drainage and associated works\n16, AP2-3\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\n20, 35\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\n26\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n30\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n17\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n25\nProvision of flood mitigation measures\nProvision of new public right of way\n27\nProvision of flood mitigation measures\n28\nProvision of environmental mitigation\n29, 37, 40, 42, 48 to 50\nProvision of worksite and access for construction\n41\nProvision of balancing pond and associated works and access for maintenance\n44\nProvision of environmental mitigation\nProvision of worksite and access for construction\nParish of Brackley\n1\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nDiversion or installation of, or works to, utilities apparatus\n4, 6\nProvision of worksite and access for construction and maintenance\n7\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n9\nProvision of worksite and access for construction\n12\nProvision of environmental mitigation\nProvision of worksite and access for construction\n13\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n14, 15\nDiversion or installation of, or works to, utilities apparatus\nParish of Radstone\n1, 2, 22\nProvision of worksite and access for construction\n5, 7a\nProvision of worksite and access for construction\nProvision of new public right of way\n6a, 6b, 20\nProvision of environmental mitigation\nProvision of worksite and access for construction\n9\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n7\nDiversion or installation of, or works to, utilities apparatus\nRemoval of utility apparatus\n8a, 16a, 16c, 18a, 18c, 40, 41, 47\nProvision of environmental mitigation\n10, 17, 21, 23, 38, AP2-4, AP2-6\nProvision of environmental mitigation\nProvision of drainage and associated works\n19, 26, 32, 33\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of balancing pond and associated works and access for maintenance\n27, 37a, 37b, 41a\nProvision of balancing pond and associated works and access for maintenance\n28, 29\nProvision of flood mitigation measures\n30\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nProvision of environmental mitigation\nProvision of new public right of way\nRemoval of utility apparatus\n36\nProvision of environmental mitigation\nRemoval of utility apparatus\nAP2-7\nProvision of new public right of way\n46\nProvision of flood mitigation measures\nParish of Greatworth\n1\nProvision of new public right of way\n3\nProvision of drainage and associated works\nProvision of flood mitigation measures\n4\nProvision of environmental mitigation\nProvision of drainage and associated works\n5\nProvision of flood mitigation measures\n8, 11, 15, 75, 76\nProvision of environmental mitigation\n9\nProvision of worksite and access for construction\nProvision of new public right of way\n12, AP2-1\nProvision of worksite and access for construction\nProvision of new public right of way\nRemoval of utility apparatus\n13\nProvision of environmental mitigation\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\nRemoval of utility apparatus\nProvision of worksite and access for construction\n19\nProvision of environmental mitigation\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\n15a\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n16, 17, 17a, 38\nDiversion or installation of, or works to, utilities apparatus\n18, 48, 59, 60, 63, 64, 66, 67, 71, 72, 74, 77, 80, 82, 84 to 86, 90, 91, 98, AP4-5\nProvision of worksite and access for construction\n10\nProvision of environmental mitigation\nProvision of new public right of way\n20, 21\nProvision of drainage and associated works\n23\nProvision of worksite and access for construction\nProvision of drainage and associated works\nRemoval of utility apparatus\n30, 70, 73\nProvision of worksite and access for construction\nRemoval of utility apparatus\n24\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nRemoval of utility apparatus\n25\nDiversion or installation of, or works to, utilities apparatus\nRemoval of utility apparatus\n39a, 39b\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\nRemoval of utility apparatus\n26\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\n28, 31, 32, 34, 52, 56, 83, 99\nProvision of worksite and access for construction\nProvision of environmental mitigation\n29a\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nRemoval of utility apparatus\nProvision of drainage and associated works\nProvision of balancing pond and associated works and access for maintenance\n33\nProvision of balancing pond and associated works and access for maintenance\n43\nProvision of flood mitigation measures\nDiversion or installation of, or works to, utilities apparatus\n44\nProvision of worksite and access for construction and maintenance\n57, 61a\nProvision of worksite and access for construction and maintenance\nProvision of new public right of way\nParish of Marston St Lawrence\n4, 23\nProvision of environmental mitigation\n5, 8, 11, 14\nProvision of worksite and access for construction\n7, 9\nProvision of environmental mitigation\nProvision of worksite and access for construction\n15\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n17\nProvision of environmental mitigation\nProvision of drainage and associated works\nAP4-1\nProvision of drainage and associated works\nParish of Sulgrave\n1\nProvision of environmental mitigation\nProvision of new public right of way\nParish of Thorpe Mandeville\n3\nProvision of new public right of way\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\n4, 16, 48, 54\nProvision of worksite and access for construction\n18, 47\nDiversion or installation of, or works to, utilities apparatus\n15, 31, 35\nProvision of environmental mitigation\n25, 41, 42\nProvision of drainage and associated works\n26\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of balancing pond and associated works and access for maintenance\nRemoval of utility apparatus\n28, 33, 36, 40, 43\nProvision of flood mitigation measures\n29, 51\nProvision of environmental mitigation\nProvision of worksite and access for construction\n60, 62\nProvision of balancing pond and associated works and access for maintenance\n69\nProvision of environmental mitigation\nProvision of drainage and associated works\nRemoval of utility apparatus\nDiversion or installation of, or works to, utilities apparatus\n71\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\nAP2-3\nProvision of a turning head\nProvision of access for construction\nParish of Culworth\n1\nDiversion or installation of, or works to, utilities apparatus\n7, 8, 13, 16\nProvision of environmental mitigation\nProvision of worksite and access for construction\n11\nProvision of environmental mitigation\nProvision of drainage and associated works\n12, 20, 23\nProvision of environmental mitigation\n17\nProvision of worksite and access for construction\nProvision of electricity supply system and access\n18\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nProvision of new public right of way\n19, AP4-1\nProvision of balancing pond and associated works and access for maintenance\n21a\nProvision of worksite and access for construction and maintenance\n22, 25, 44\nProvision of worksite and access for construction\n29\nProvision of drainage and associated works\n34\nProvision of worksite and access for construction\nProvision of drainage and associated works\n39\nProvision of flood mitigation measures\nParish of Chipping Warden and Edgcote\n2, 4, 9, 28, 32, 33, 95, 96, 105, AP4-1, AP4-1a, AP4-1b, AP4-2\nProvision of environmental mitigation\n35, 36, 39\nDiversion or installation of, or works to, utilities apparatus\n11\nProvision of worksite and access for construction\nProvision of flood mitigation measures\n3, 14, 41\nProvision of flood mitigation measures\n15, 16, 24, 27, 38, 43, 48 to 50, 81b, 81d, 82b, 83b, 84, 86, 87a, 87b, 87c, 89a, 90, 91, 92b, 93, 104, 107, AP2-16, AP2-17, AP4-12, AP4-13\nProvision of worksite and access for construction\n18a\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n25\nProvision of worksite and access for construction and maintenance\n47, AP2-1\nProvision of balancing pond and associated works and access for maintenance\n58\nProvision of environmental mitigation\nProvision of new public right of way\n65a\nProvision of environmental mitigation\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\n71, AP1-3, AP2-15\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n72a, AP2-21\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n94a, 99\nProvision of worksite and access for construction\nProvision of new public right of way\nAP2-3, AP2-5, AP2-13\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nAP2-14\nProvision of a turning head\nAP2-9\nProvision of drainage and associated works\nAP4-3\nProvision of drainage and associated works\nAP4-10, AP4-11\nProvision of access for construction\nParish of Aston Le Walls\n3, 32, AP4-1\nProvision of worksite and access for construction\n9\nDiversion or installation of, or works to, utilities apparatus\n10\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n17\nProvision of worksite and access for construction\nProvision of new public right of way\n20\nProvision of environmental mitigation\n23, 25, AP2-1\nProvision of environmental mitigation\nProvision of worksite and access for construction\n28a, 31, AP2-2, AP2-3\nProvision of balancing pond and associated works and access for maintenance\n39, AP2-4\nProvision of drainage and associated works\nParish of Boddington\n11, 29, 39, 52, 54, 66, AP2-1, AP4-3\nProvision of drainage and associated works\n3, 23, 26, 27a, 27b, 50, 51, 89, 107b, 109b, AP4-1, AP4-2\nProvision of worksite and access for construction\n2a, 40a, 87, 96, 98, 114, 123b, AP2-2\nProvision of environmental mitigation\nProvision of worksite and access for construction\n18\nProvision of environmental mitigation\nProvision of new public right of way\nProvision of worksite and access for construction\n97, 100a, 107a, 109a\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\nDiversion or installation of, or works to, utilities apparatus\n85\nDiversion or installation of, or works to, utilities apparatus\n16, 56, 86\nProvision of flood mitigation measures\n91\nDiversion or installation of, or works to, utilities apparatus\nProvision of environmental mitigation\n25, 30a, 30b, 57, 62, 63, 71, 72, 80, 93, 115, 121\nProvision of environmental mitigation\n97a and 99\nDiversion or installation of, or works to, utilities apparatus\nRemoval of utility apparatus\n101\nProvision of worksite and access for construction and maintenance\n14a\nProvision of balancing pond and associated works and access for maintenance\nProvision of flood mitigation measures\n22\nProvision of environmental mitigation\nProvision of new public right of way\nProvision of worksite and access for construction\n28\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of balancing pond and associated works and access for maintenance\n61\nProvision of environmental mitigation\nRemoval of utility apparatus\n69\nProvision of balancing pond and associated works and access for maintenance\n74\nProvision of environmental mitigation\nProvision of worksite and access for construction\nRemoval of utility apparatus\n81\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\n103a\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of worksite and access for construction and maintenance\nCounty of Warwickshire District of Stratford-on-Avon Parish of Stoneton\n5, 7, 8, 13, 14, 16a, 28\nProvision of environmental mitigation\n15\nDiversion or installation of, or works to, utilities apparatus\n16, 18\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n19\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n6b, 9b, 22, 24\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nParish of Wormleighton\n21\nProvision of environmental mitigation\n12, AP2-4\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n11, 15, 17, 18, 20\nProvision of worksite and access for construction and maintenance\n13\nDiversion or installation of, or works to, utilities apparatus\n23, 25\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\n26\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\nProvision of access for construction and maintenance of utility diversions\n28\nProvision of environmental mitigation\nProvision of access for construction and maintenance of utility diversions\n31b\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n34a, 47\nProvision of environmental mitigation\nProvision of worksite and access for construction\n50\nDiversion or installation of, or works to, utilities apparatus\nProvision of environmental mitigation\n52\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n55\nProvision of worksite and access for construction\nParish of Radbourn\n2, 13b, 19, 28\nProvision of worksite and access for construction\n3\nProvision of worksite and access for construction\nReprofiling of ground\nProvision of drainage and associated works\n6\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\n7\nProvision of worksite and access for construction\nReprofiling of ground\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n8, 8c\nProvision of flood mitigation measures\n8b\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\nReprofiling of ground\nProvision of new public right of way\n9\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\nProvision of new public right of way\nProvision of environmental mitigation\n11\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction and maintenance\nProvision of new public right of way\n13a\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\n15\nProvision of environmental mitigation\n16\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n5\nDiversion or installation of, or works to, utilities apparatus\nProvision of flood mitigation measures\nProvision of access for construction and maintenance of utility diversions\n8d\nProvision of environmental mitigation\nProvision of worksite and access for construction\nParish of Ladbroke\n5, 19, 20, 25 to 27\nDiversion or installation of, or works to, utilities apparatus\n7, 12, 15, 39, 41, 42, 52\nProvision of environmental mitigation\n8, 18\nReprofiling of ground\nProvision of drainage and associated works\nProvision of worksite and access for construction\n24, 28, 32\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\n29, 33, 71, 72\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n35, 56, 62, 63, 76\nProvision of environmental mitigation\nProvision of drainage and associated works\n36, 61\nProvision of worksite and access for construction\n37, AP4-2, AP4-3\nProvision of new public right of way\n53, 59, 69\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of worksite and access for construction\n66\nProvision of balancing pond and associated works and access for maintenance\nAP4-1\nMinor highway alterations\nParish of Southam\n5, 31, 63, 65, 70, 72, 90, 93\nProvision of environmental mitigation\n54, 56, 58, 60 to 62, 87, AP1-1, AP1-2\nDiversion or installation of, or works to, utilities apparatus\n6, 9, 111\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n13, 94, 95\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n8, 14, 103\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\n24, 32\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n34, 39, 55, 68, 80\nProvision of environmental mitigation\nProvision of worksite and access for construction\n16, 41, 53, 91\nProvision of worksite and access for construction\n28, 29\nProvision of drainage and associated works\n45\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\n47\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\n49, 51, 52, AP4-1 to AP4-3\nProvision of new public right of way\n75\nProvision of environmental mitigation\nProvision of access for construction and maintenance of utility diversions\n100\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of flood mitigation measures\n107\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nProvision of flood mitigation measures\n112, 118\nProvision of worksite and access for construction and maintenance\nParish of Long Itchington\n1, 15, 19, 30a, 35a, 37, 47, AP4-4\nProvision of environmental mitigation\n2\nProvision of worksite and access for construction and maintenance\n6\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n7\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n7a\nProvision of drainage and associated works\n9\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of access for construction and maintenance of utility diversions\n12, 49, 50, 52, 63, 64\nDiversion or installation of, or works to, utilities apparatus\n20, 22, 31, 32\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n53\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction and maintenance\n48, 57\nProvision of worksite and access for construction\n58\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n59, 61\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\n11a\nRemoval of utility apparatus\nParish of Ufton\n2\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n8, 21, 23, 24\nDiversion or installation of, or works to, utilities apparatus\n9\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of drainage and associated works\n15\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDrainage and associated work\n11, 18\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\nProvision of drainage and associated works\nProvision of flood mitigation measures\nAP4-4 to AP4-7\nProvision of access for construction\nDistrict of Warwick Parish of Offchurch\n4, 6, 32, 49, 50, 51a, 54a\nProvision of environmental mitigation\n7, 10, 98a\nProvision of worksite and access for construction and maintenance\n11\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n12, AP2-1\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nProvision of drainage and associated works\n13, 19, 28, 36, 42 to 44, 53a\nProvision of environmental mitigation\nProvision of worksite and access for construction\n15\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\n18\nProvision of environmental mitigation\nMinor highway alterations\n21, 45, 58, 59b, 60, 62\nProvision of worksite and access for construction\n23\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of drainage and associated works\n24\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of drainage and associated works\n27\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\n29, 66, 89\nDiversion or installation of, or works to, utilities apparatus\n37, 73\nProvision of balancing pond and associated works and access for maintenance\n57a\nProvision of worksite and access for construction\nProvision of drainage and associated works\n68, 70, 84\nReprofiling of ground\nProvision of worksite and access for construction\n69\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\n71, 75\nProvision of new public right of way\n78, 79, 87\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\nDiversion or installation of, or works to, utilities apparatus\n80\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\nProvision of access for construction and maintenance of utility diversions\n91a\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\nProvision of flood mitigation measures\n92a\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n47a\nProvision of a turning head\n51b\nProvision of a turning head\nProvision of environmental mitigation\nAP2-2, AP2-3\nMinor highway alterations\nParish of Cubbington\n1a\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n19, 21, 41, 46, 49, 53, 57, 61, 65\nProvision of worksite and access for construction\n23, 27, 28, 50, 52, 67\nProvision of environmental mitigation\n4\nDiversion or installation of, or works to, utilities apparatus\n5, 6\nProvision of access for construction and maintenance\nProvision of access for construction and maintenance of utility diversions\n9\nProvision access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n11a, 14, 15\nProvision of environmental mitigation\nDrainage and associated works\nProvision of worksite and access for construction\n32\nProvision of drainage and associated works\nProvision of worksite and access for construction\n35\nProvision of environmental mitigation\nProvision of drainage and associated works\nInstallation of ground anchors\n39, 48\nProvision of environmental mitigation\nProvision of worksite and access for construction\n44\nProvision of new public right of way\n47\nProvision of access for construction and maintenance\nAP4-3\nProvision of environmental mitigation\nParish of Weston Under Wetherley\n1, 2\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n4, 5a, AP4-1 to AP4-3\nProvision of environmental mitigation\nAP4-4\nProvision of worksite and access for construction and maintenance\nParish of Stoneleigh\n1, 5, 7, 10, 13, 18, 44, 119, 123, 124, 126, 129, 130, 142a, 147, 148, 152, 152a, 155, AP2-1 to AP2-3, AP4-7, AP4-8\nProvision of worksite and access for construction\n8, 27, 50, 52, 54a, 94, 117, 122, 164, 165, 167, 179, AP4-10, AP4-11\nProvision of environmental mitigation\n21, 24, 28, 29, 31, 34, 43, 77a, 83\nDiversion or installation of, or works to, utilities apparatus\n22, 42, 144, 158, 163\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of worksite and access for construction\n33, 62\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\n48a, 66, 75, 96, 127, 128, 137, 138, 151, 173, 174, 177, AP4-10a, AP4-10b\nProvision of environmental mitigation\nProvision of worksite and access for construction\n55\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\n63\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\nProvision of drainage and associated works\n73, AP4-1\nProvision of drainage and associated works\n79a, 87, 112, 139\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n84\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n136, 141\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n97, 100, 143\nProvision of worksite and access for construction and maintenance\n99\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n104\nProvision of balancing pond and associated works and access for maintenance\n105\nProvision of environmental mitigation\nProvision of flood mitigation measures\n132\nProvision of flood mitigation measures\n133, AP4-12\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n140b, 146\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n166, 182\nProvision of environmental mitigation\nProvision of new public right of way\n171a\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\n178\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n184\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\nParish of Kenilworth\n12, 30a, AP2-3\nProvision of environmental mitigation\n13, 16, 21, AP2-1, AP2-2\nProvision of worksite and access for construction\n5, 6, 23, 25a\nProvision of environmental mitigation\nProvision of worksite and access for construction\n9, 11, 15\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n20\nProvision of worksite and access for construction\nProvision of new public right of way\nParish of Burton Green\n4, 6, 9, 13, 14, 23a, 37a, 43a, 48, 58b, 65a, 65b, 73a, 82a, 97, AP2-7, AP2-9, AP2-10, AP2-12\nProvision of environmental mitigation\nProvision of worksite and access for construction\n7, 19, 59, 63, AP4-1 to AP4-4\nProvision of environmental mitigation\n11, 21, AP1-1a\nProvision of worksite and access for construction\n28a, 28b, 28c\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n29, 31\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n32, AP2-3\nProvision of worksite and access for construction and maintenance\n33a\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of drainage and associated works\nProvision of new public right of way\n35\nReinstatement of businesses or facilities\n72\nProvision of environmental mitigation\nProvision of new public right of way\n77\nProvision of new public right of way\n98\nProvision of worksite and access for construction\nProvision of new public right of way\nAP2-1\nProvision of worksite and access for construction\nProvision of environmental mitigation\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\nAP2-6\nProvision of passing places\nDistrict of North Warwickshire Parish of Great Packington\n1, 6\nProvision of worksite and access for construction\n7, 8\nProvision of balancing pond and associated works and access for maintenance\nParish of Little Packington\n2\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\n4\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n10, 12, 15, 16\nDiversion and installation of overhead electric lines\n17, 19\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\nAP1-1\nReinstatement of businesses or facilities\nParish of Coleshill\n1c\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n1f, 1g, 1r\nProvision of balancing pond and associated works and access for maintenance\n1, 2 to 5, 7, 12, 13, 112, 127, 134, 136, 139, 145, 148, 150, 160, 204, 272, 304, 306, 397, 408, 410, 435, 445, 479, 514, AP4-1b, AP4-15, AP4-17, AP4-22\nDiversion and installation of overhead electric lines\n33, 35 to 37, 40, 41, 85, 381, 433, 454, 455, 482a, 540, 556, 558a, 561a, 565a\nDiversion or installation of, or works to, utilities apparatus\n38\nProvision of balancing pond and associated works and access for maintenance\n48, 52, 58, 59, 63, 68, 101, 102, 106, 278, 288a, 295, 296, 365, 371, 413, 420, 581a, 589a\nProvision of worksite and access for construction\n50\nDiversion and installation of overhead electric lines\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of balancing pond and associated works and access for maintenance\n116, 124, 162a, 180b, 240, 241, 244, 246a, 248, 300, 302, 309, 320, 325, 326, 357, 367, 372, 428, 484, 509, 510, 519, AP2-21, AP2-24, AP2-26 to AP2-28\nProvision of environmental mitigation\n51, 440, 495a\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n73\nProvision of environmental mitigation\nRemoval of existing utilities\n546a\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n74, 321, 452a, 452b, 546\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n75, 233a, 322, 377, 391, 396\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\n77, 87a, 90a, 90b, 91a, 91b, 92a, 92b 103a, 103b, 108b, 108c, 152, 157, 548a\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n112b\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion and installation of overhead electric lines\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\n127a\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\n108a, 310, 315, 354, 506 to 508, 580a\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n100, 427\nProvision of worksite and access for construction and maintenance\n164\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nDiversion and installation of overhead electric lines\n283, 289, 297, 312a, 335, 346, 366, 369\nProvision of environmental mitigation\nProvision of worksite and access for construction\n188\nProvision of balancing pond and associated works and access for maintenance\nProvision of worksite and access for construction\n195, 196\nProvision of worksite and access for construction\nDiversion and installation of overhead line equipment\n199\nProvision of balancing pond and associated works and access for maintenance\nDiversion and installation of overhead line equipment\n247, 257a\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\nProvision of new public right of way\n253, 388, 416, 451, 459, 460, 502\nProvision of environmental mitigation\nDiversion and installation of overhead line equipment\n308, 318, 467\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\n358\nDiversion and installation of overhead line equipment\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of balancing pond and associated works and access for maintenance\n404, 409\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n432\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n412\nProvision of environmental mitigation\nDiversion and installation of overhead line equipment\n419, 517a\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of new public right of way\n481\nProvision of environmental mitigation\nProvision of new public right of way\n491a, 491b\nProvision of environmental mitigation\nProvision of new public right of way\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n511, 559a, 559b, AP2-20\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of balancing pond and associated works and access for maintenance\n526a, 526b\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n593a, 593b\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead line equipment\n439, 485, 486\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n492, 500\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\nParish of Water Orton\n6, 132\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n9a, 10, 27, 28, 37, 40, 43a, 82a\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n13a, 42, 50, 57, 64, 65, 67 to 69, 74\nProvision of environmental mitigation\n23, 34, 35, 38, 39, 41, 77a\nProvision of environmental mitigation\nProvision of worksite and access for construction\n43, AP4-5\nReinstatement of businesses or facilities\n44, 89a, 126, 130, 142, AP4-25, AP4-26\nProvision of worksite and access for construction\n48\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of balancing pond and associated works and access for maintenance\n52\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n53, 54, 56\nProvision of balancing pond and associated works and access for maintenance\n76\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\n100a, 100b, 100c, 118\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n119a, 123\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n124a, 124b, 129, 139a\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n131a, 131b, 145, 146a, 146b, 149a, 149b, AP4-19, AP4-20\nDiversion and installation of overhead electric lines\n138a\nDiversion or installation of, or works to, utilities apparatus\n133, 140, 143\nProvision of worksite and access for construction and maintenance\n155a, 155b\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\nProvision of balancing pond and associated works and access for maintenance\nAP4-14, AP4-16, AP4-17\nProvision of worksite and access for construction\nMinor highway alterations\nParish of Shustoke\nAP4-1 to AP4-3, AP4-5, AP4-6\nProvision of environmental mitigation\nParish of Curdworth\n1a, 49, 70, 72, 77, 78, 80, 106, 215\nDiversion or installation of, or works to, utilities apparatus\n2\nProvision of worksite and access for construction and maintenance\nProvision of environmental mitigation\n3a, 6, 7, 113a, 201, 202, 223, 241, 244\nProvision of worksite and access for construction\n5a, 5b, 8a, 11a, 37, 39, 40, 43, 51b, 58, 59, 61, 82a, 96, 102, 153a, 168, 170, 174, 186, 187, AP1-1, AP1-2, AP4-1, AP4-17 to AP4-24, AP4-30, AP4-32\nDiversion and installation of overhead electric lines\n13, AP2-6\nProvision of worksite and access for construction\nProvision of environmental mitigation\n16, 21 to 23, 34, 38, 57, 81, 114, 117, 118, 121, 128, 137, 140, 141, 142, 149, 152, 155, 156, 160, 192, 200, AP1-5, AP1-6, AP2-7 to AP2-9, AP4-3 to AP4-9\nProvision of environmental mitigation\n10a, 25a, 26 to 28, 31, 32, 45, 48, 69\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n35, 191, 194\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n210, 216, 219, 220 to 222, 225 to 227, 229, 231, 235, 236, 238, 240, 243, 245, 246\nProvision of worksite and access for construction and maintenance\n51a, 68a\nProvision of balancing pond and associated works and access for maintenance\nDiversion and installation of overhead electric lines\n65a, 66a, 81a\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n71\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n67a, 83, 83a, 90 to 92\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\n88, 209, 233, 247\nProvision of new public right of way\n98, 101, 103\nInstallation of ground anchors\n99, 103a\nInstallation of ground anchors\nProvision of access for utility works\n108a\nProvision of environmental mitigation\nProvision of access for utility works\n153, 164, 251, 254, 256\nDiversion or installation of, or works to, utilities apparatus\nProvision of environmental mitigation\n228\nRemoval of utility apparatus\n249\nProvision of new public right of way\nProvision of environmental mitigation\n252\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\nAP2-10\nProvision of access for maintenance\nParish of Lea Marston\n1 to 4, 13, 16\nDiversion or installation of, or works to, utilities apparatus\n12, 14\nProvision of environmental mitigation\nProvision of drainage and associated works\n17, 24a, 26, 28 to 30, 32, 33, 35, 37, 41, 54, 55a, 59, 61, 65a, 71a, AP2-1, AP2-8 to AP2-12, AP2-17, AP2-18, AP2-25, AP4-1 to AP4-4\nProvision of environmental mitigation\n18\nProvision of balancing pond and associated works and access for maintenance\n44, 47, 49, AP2-23\nProvision of new public right of way\n66\nProvision of new public right of way\nProvision of worksite and access for construction\n67\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n72a, 72b, 73\nProvision of new vehicular right on existing public right of way\n74a\nProvision of environmental mitigation\nProvision of new public right of way\n55b, 68b\nProvision of environmental mitigation\nMinor highway alterations\n78a, AP2-22\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\nProvision of environmental mitigation\nAP2-24\nProvision of new public right of way\nParish of Kingsbury\n2, AP2-1, AP2-2\nProvision of environmental mitigation\nParish of Middleton\n4, 108\nProvision of environmental mitigation\nProvision of flood mitigation measures\n27, 37, 39, 47, 72 to 74, 87, 93, 95, 99, 101 to 103, 114, 115, 121, 125, 131a, 134a, 148, 160, 167, 175, AP2-6 to AP2-8, AP2-10b, AP2-18, AP2-21\nProvision of environmental mitigation\n100, AP2-10a\nProvision of environmental mitigation\nProvision of flood mitigation measures\nProvision of balancing pond and associated works and access for maintenance\n21, 30, 32\nDiversion and installation of overhead electric lines\n110, 169a\nProvision of worksite and access for construction and maintenance\nProvision of environmental mitigation\n5a, 13a, 31a, 127a, 135a, AP2-10, AP2-10c, AP2-20\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\nProvision of worksite and access for construction and maintenance\nProvision of flood mitigation measures\n38, 66\nDiversion or installation of, or works to, utilities apparatus\n41\nProvision of flood mitigation measures\n52\nProvision and renewal of railway systems for operational purposes and drainage\n11a, 57, 58, 135b, 135c, 135d, 138a, 142a, 147a, 153a, 154a, 156a, 157a, 164a, 171a, 174, AP2-3, AP2-4, AP2-4a, AP2-11b\nProvision of environmental mitigation\nProvision of worksite and access for construction\nAP2-9\nProvision of new public right of way\n107\nProvision of environmental mitigation\nProvision of flood mitigation measures\nProvision of worksite and access for construction and maintenance\n112, AP2-5\nProvision of balancing pond and associated works and access for maintenance\n113\nProvision of balancing pond and associated works and access for maintenance\nProvision of worksite and access for construction and maintenance\n124, 129, AP2-5a\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\n128\nProvision of balancing pond and associated works and access for maintenance\nProvision of worksite and access for construction\nCounty of Staffordshire District of Lichfield Parish of Drayton Bassett\n2a, 3, 4a, 4b, 35, 38, 40, 43, 45, 46, 49, 52, 54, 55, 65, 75, 100, AP2-1, AP2-3, AP2-4\nProvision of environmental mitigation\n28\nDiversion or installation of, or works to, utilities apparatus\n7, 23, 29, 50, 86\nDiversion and installation of overhead electric lines\n13a, AP4-1\nProvision of worksite and access for construction and maintenance\n16\nProvision of worksite and access for construction\n19a, AP2-6\nProvision of balancing pond and associated works and access for maintenance\n22, 24\nProvision of environmental mitigation\nProvision of flood mitigation measures\nProvision of worksite and access for construction\n30\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\n33\nProvision of environmental mitigation\nProvision of drainage and associated works\n53, 92, 94, 102, AP2-7\nProvision of environmental mitigation\nProvision of worksite and access for construction\n58, 59, 63, 68, 71, 80\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n93\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n99\nProvision of environmental mitigation\nProvision of new public right of way\n106\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\n109, 117, AP2-8 to AP2-10\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\n114, AP2-2\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\nProvision of worksite and access for construction\nParish of Fazeley\n3, 6, 8\nDiversion and installation of overhead electric lines\nParish of Hints with Canwell\n15, 17, 18, 87, 88, AP2-20\nProvision of worksite and access for construction and maintenance\n20\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n21, 53, 59, 63, 68, 71a, 72, 74, 81, 122, 128, 141, 145, 147a, AP2-12, AP2-17\nProvision of environmental mitigation\n23, 125, 129\nDiversion or installation of, or works to, utilities apparatus\n24, 50, 62b, 73a, 76a, 77b, 77c, 77d, 84a, 84b, 110, 154\nProvision of environmental mitigation\nProvision of worksite and access for construction\n25, 28\nProvision of worksite and access for construction\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\n30, 33, 38, 45, 47, 48\nDiversion and installation of overhead electric lines\n35\nDiversion and installation of overhead electric lines\nProvision of new public right of way\nProvision of worksite and access for construction\nProvision of environmental mitigation\n37, 39\nDiversion and installation of overhead electric lines\nProvision of new public right of way\n55a, 62a, 62c, 73b, 77a, AP2-9a, AP2-18, AP2-19\nProvision of environmental mitigation\nProvision of new public right of way\nProvision of worksite and access for construction\n58, AP2-22, AP2-23, AP2-24a\nProvision of drainage and associated works\n61\nImplementation of woodland management measures\n65, 143\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n70\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\n75a, 75b\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\nProvision of new public right of way\n78a, 78b, 96a\nProvision of environmental mitigation\nProvision of flood mitigation measures\n80\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n82a\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\nImplementation of woodland management measures\n86\nProvision of balancing pond and associated works and access for maintenance\n94\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n101\nProvision of environmental mitigation\nProvision of new public right of way\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\n116 to 118, 123\nProvision of worksite and access for construction\n131a\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\nProvision of new public right of way\n153, 155\nProvision of environmental mitigation\nProvision of drainage and associated works\n157a, 159\nProvision of worksite and access for construction\nProvision of drainage and associated works\nProvision of environmental mitigation\nParish of Weeford\n7, 24, 27\nProvision of environmental mitigation\n12, 16, 21\nProvision of worksite and access for construction\n14\nProvision of access for construction and maintenance\n20\nProvision of environmental mitigation\nProvision of worksite and access for construction\n22\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\nAP1-5, AP1-8, AP1-10, AP1-11\nDiversion and installation of overhead electric lines\nAP2-1\nProvision of drainage and associated works\nParish of Swinfen and Packington\n11, 16, 23\nProvision of environmental mitigation\n11a, AP2-1, AP2-2\nProvision of drainage and associated works\n12, 15, 29\nProvision of environmental mitigation\nProvision of worksite and access for construction\n20\nProvision of environmental mitigation\nProvision of new public right of way\n17a, 18a, 19, 22\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\n33, 34, 42\nProvision of worksite and access for construction\n36, 39\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n37\nDiversion or installation of, or works to, utilities apparatus\nParish of Whittington\n5, 17, 63, 67, AP2-25, AP2-26\nDiversion or installation of, or works to, utilities apparatus\n19a, 20a, 23, 101a, AP2-2 to AP2-4\nProvision of environmental mitigation\n92a, 92b, AP2-5, AP2-6\nProvision of environmental mitigation\nProvision of balancing pond and associated works and access for maintenance\n28, 29, 31, 100a, 104a, 105a, 107, 112, 114a\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n32, 47, 48\nImplementation of woodland management measures\n37, 41\nImplementation of woodland management measures\nProvision of new public right of way\n42, 46\nProvision of environmental mitigation\nProvision of worksite and access for construction\nImplementation of woodland management measures\n52, 54, 116a\nProvision of worksite and access for construction and maintenance\n58, 64, 66, 98a\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n79, 91, AP2-28, AP2-29\nProvision of worksite and access for construction\n81a\nProvision of worksite and access for construction\nProvision of balancing pond and associated works and access for maintenance\n25a\nProvision of environmental mitigation\nProvision of access for maintenance\nAP2-10, AP2-11, AP2-38\nDiversion or installation of, or works to, utilities apparatus\nProvision of flood mitigation measures\nAP2-20\nProvision of drainage and associated works\n94a\nProvision of environmental mitigation\nProvision of drainage and associated works\n103a\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nParish of Fradley and Streethay\nAP2-1, AP2-21\nProvision of environmental mitigation\nAP2-24, AP2-30, AP2-36a, AP2-37, AP2-38, AP2-44, AP2-45, AP2-66, AP2-67, AP2-70, AP2-72, AP2-72a, AP2-76, AP2-80, AP2-82, AP2-106, AP2-134, AP2-135, AP2-135a, AP2-136, AP2-138\nProvision of worksite and access for construction\nAP2-22, AP2-46, AP2-47, AP2-50, AP2-51, AP2-52, AP2-53, AP2-55, AP2-59, AP2-60, AP2-65, AP2-83, AP2-85, AP2-87, AP2-88, AP2-90, AP2-92, AP2-93, AP2-98, AP2-100, AP2-104, AP2-105, AP2-107, AP2-109, AP2-110, AP2-111, AP2-114, AP2-116, AP2-128, AP2-129, AP2-130, AP2-131a, AP2-132, AP2-133, AP2-141, AP2-143, AP2-145, AP2-146, AP2-147, AP2-150, AP2-151, AP2-155, AP2-157\nProvision of environmental mitigation\nProvision of worksite and access for construction\nAP2-119, AP2-120, AP2-122\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of drainage and associated works\nAP2-61, AP2-62, AP2-64\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\nAP2-40, AP2-43, AP2-68, AP2-71, AP2-163\nProvision and renewal of railway systems for operational purposes and drainage\nAP2-19, AP2-20, AP2-23\nDiversion or installation of, or works to, utilities apparatus\nAP2-16\nProvision of environmental mitigation\nProvision and renewal of railway systems for operational purposes and drainage\nProvision of drainage and associated works\nAP2-117\nProvision of new public right of way\nParish of Curborough and Elmhurst\nAP4-3 to AP4-7\nDiversion or installation of, or works to, utility apparatus\nParish of Lichfield\nAP4-3\nDiversion or installation of, or works to, utility apparatus\nParish of Longdon\n4 to 6, 8 to 10, 13, 14\nDiversion and installation of overhead electric lines\nParish of Kings Bromley\n1, 4\nProvision and renewal of railway systems for operational purposes and drainage\n119, 160, 185, 186, 193a, 194, AP2-3, AP2-5, AP2-8, AP2-9, AP2-11 to AP2-13, AP2-27, AP2-28\nProvision of environmental mitigation\nProvision of worksite and access for construction\n98, 100, 114a, 118a, 124a, 130a, AP2-17, AP2-41, AP2-46a\nProvision of worksite and access for construction and maintenance\nAP2-54\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\nProvision of worksite and access for construction\nAP2-33, AP2-35a, AP2-35b, AP2-35c\nProvision of worksite and access for construction\nProvision of environmental mitigation\nProvision of drainage and associated works\n52a, 52b, 121\nProvision of worksite and access for construction\n165, AP2-52, AP2-52a, AP2-53\nProvision of environmental mitigation\nAP2-46b, AP2-46c\nProvision of environmental mitigation\nProvision of drainage and associated works\n61a, 78, 81, 146, AP2-7, AP2-40, AP4-2, AP4-3, AP4-5, AP4-6, AP4-8, AP4-9\nDiversion or installation of, or works to, utilities apparatus\n62, 65, 140A, 192, 192b, AP1-1 to AP1-5, AP1-7, AP1-9 to AP1-12, AP2-39, AP2-43, AP2-44, AP4-1\nDiversion and installation of overhead electric lines\n83, 90\nDiversion and installation of overhead electric lines\nProvision of environmental mitigation\n85a, 86\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n88\nProvision of access for construction\n91, 195, 196\nProvision of drainage and associated works\n95, 168, 187\nProvision of worksite and access for construction and maintenance\nProvision of environmental mitigation\n102, AP2-35a\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\n128a\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nAP2-31a\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n138, 139, 142\nDiversion or installation of, or works to, utilities apparatus\nProvision of worksite and access for construction\n148\nDiversion or installation of, or works to, utilities apparatus\nProvision of environmental mitigation\nProvision of worksite and access for construction\n161, 171\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\nAP2-15, AP2-19, AP2-20a, AP2-21a, AP2-25\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n130b\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\nProvision of drainage and associated works\n140c\nDiversion or installation of, or works to, utilities apparatus\nDiversion and installation of overhead electric lines\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nParish of Armitage with Handsacre\n1, 4\nProvision of worksite and access for construction\n11, 14, 15\nProvision of worksite and access for construction\nProvision of drainage and associated works\n18, 20, 24, AP2-1 to AP2-3\nProvision of worksite and access for construction and maintenance\nParish of Colton\n10, 16, 17\nProvision and renewal of railway systems for operational purposes and drainage\nBorough of Stafford Parish of Colwich\n24, AP2-1\nProvision and renewal of railway systems for operational purposes and drainage\nMetropolitan Borough of Solihull Parish of Berkswell\n2a, 4, 28a, AP2-4\nProvision of environmental mitigation\nProvision of worksite and access for construction\n6a, 6b, 8, 9, 10, 12, 17, 32c, 67, AP2-8, AP2-9\nProvision of worksite and access for construction\n24, 26b, 47, 54, 71, 72\nDiversion and installation of overhead electric lines\n31\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n35\nProvision of environmental mitigation\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utilities apparatus\nProvision of electricity supply system and access\n36a, 36b\nProvision of environmental mitigation\nDiversion or installation of, or works to, utilities apparatus\n37\nProvision of electricity supply system and access\n42, AP2-10, AP2-11\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of new public right of way\n43\nProvision of environmental mitigation\nProvision of worksite and access for construction\nInstallation of ground anchors\n53\nProvision of new public right of way\n55\nProvision of environmental mitigation\nProvision of drainage and associated works\nProvision of worksite and access for construction\nProvision of new public right of way\n59\nProvision of worksite and access for construction\nProvision of new public right of way\n60, 64 and 69\nProvision of drainage and associated works\nProvision of worksite and access for construction\n63\nProvision of environmental mitigation\nProvision of drainage and associated works\n32b, 127, 128, 134, 145, 164a, 165c, 209, AP2-14\nProvision of environmental mitigation\n129, 136, 167, 168a, 168c, 169, 170, 172a, 174, 185, 186, 188, 191, 193, 205, 207, 216, 218, 219, 231, 236\nProvision of worksite and access for construction\n130a, 142\nProvision and renewal of railway systems for operational purposes and drainage\n143\nProvision of a worksite and access for construction and maintenance\nProvision of balancing pond and associated works and access for maintenance\n140, 141, 162, 175, 206, 211, 220, 230\nProvision of worksite and access for construction and maintenance\n147, 151, 152, 153, 155\nProvision of worksite and access for construction and maintenance\nDiversion or installation of, or works to, utility apparatus\nProvision of environmental mitigation\n158\nProvision of flood mitigation measures\nProvision of worksite and access for construction and maintenance\n172, 221, 222\nProvision of flood mitigation measures\nProvision of worksite and access for construction\n195, 204, 208, 238\nProvision of environmental mitigation\nProvision of worksite and access for construction\n223, 233\nProvision of balancing pond and associated works and access for maintenance\nParish of Meriden\n3\nProvision of environmental mitigation\nProvision of worksite and access for construction\nParish of Hampton-in-Arden\n1\nProvision of worksite and access for construction and maintenance\nProvision of new public right of way\n2\nProvision of environmental mitigation\n4, 6, AP2-6\nProvision of environmental mitigation\nProvision of worksite and access for construction\n7, 15, 16, 16b, 17, 17b, 18, 27 to 29, 30a, 31a, 37b, 50a, 52, 54, 62, AP2-24\nProvision of worksite and access for construction\n8, 26, 34, 45, 55\nProvision of balancing pond and associated works and access for maintenance\n9\nProvision of drainage and associated works\n16a, 17a, 18a, AP2-8, AP2-10, AP2-11\nProvision of worksite and access for construction\nProvision of flood mitigation measures\n22\nProvision of worksite and access for construction and maintenance\n24, 43\nProvision of a turning head\n36, 41\nProvision of worksite and access for construction and maintenance\nProvision of balancing pond and associated works and access for maintenance\n35, 42\nProvision of worksite and access for construction and maintenance\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n46a\nProvision of balancing pond and associated works and access for maintenance\nProvision of new public right of way\n47a\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utility apparatus\n49\nProvision of flood mitigation measures\n25b, 25c\nMinor highway alterations\n37a\nProvision of balancing pond and associated works and access for maintenance\nProvision of drainage and associated works\nProvision of environmental mitigation\n47b\nProvision of worksite and access for construction\nDiversion of installation of or works to, utilities apparatus\nProvision of new public rights of way\nProvision of worksite and access for construction\nAP2-26\nProvision of drainage and associated works\nParish of Bickenhill\n2, 3\nProvision of balancing pond and associated works and access for maintenance\n6, 7, 10, 18, 22, 23, 29, 31, 32, 35, 46, 48, 57, 60, 61, 69, 71a, 74 to 76\nProvision of worksite and access for construction\n37, 40, 41b, 62, 69a\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n41\nProvision of worksite and access for construction and maintenance\nDiversion and installation of overhead electric lines\n12\nProvision of balancing pond and associated works and access for maintenance\n11\nProvision of balancing pond and associated works and access for maintenance\nMinor highway alterations\n42a, 42b, 42c, 57a, 57b, 57c\nProvision and renewal of railway systems for operational purposes and drainage\n58\nDiversion or installation of, or works to, utilities apparatus\n71\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\nProvision of balancing pond and associated works and access for maintenance\n71b\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\nProvision of balancing pond and associated works and access for maintenance\n85\nProvision of environmental mitigation\nDiversion and installation of overhead electric lines\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n87\nProvision of environmental mitigation\n90\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n88\nProvision of balancing pond and associated works and access for maintenance\nDiversion or installation of, or works to, utilities apparatus\n91\nDiversion or installation of, or works to, utilities apparatus\nReinstatement of businesses or facilities\n91a\nReinstatement of businesses or facilities\nParish of Dickens Heath\nAP4-1\nReinstatement of businesses or facilities\nParish of Chelmsley Wood\n6\nProvision of worksite and access for construction and maintenance\nCity of Birmingham\n1a\nDiversion and installation of overhead electric lines\n3a, 4b, 4c, AP2-11, AP2-12\nProvision of worksite and access for construction\n5a\nProvision of environmental mitigation\n12\nProvision of environmental mitigation\nProvision of worksite and access for construction\n8\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utilities apparatus\n9\nProvision of environmental mitigation\nProvision of flood mitigation measures\n9a and 9b\nProvision of environmental mitigation\nProvision of flood mitigation measures\nDiversion and installation of overhead electric lines\n13a, 15, 29, 32, 33\nProvision of environmental mitigation\nProvision of worksite and access for construction\nProvision of flood mitigation measures\n14, 28\nProvision of environmental mitigation\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\nProvision of flood mitigation measures\n16, 31, 54 to 56, 69, 78, 157m, 157n, 157p, 157q, 157s, 159, 163, 194, 195, 196, 214 to 216, 218, 281, 282, 300h, 308, 315, 316, 320, 327, 328, 330, 353, 364, 385, 386, 401\nProvision of worksite and access for construction\n23, 24, 27\nProvision of worksite and access for construction\nDiversion and installation of overhead electric lines\n26\nProvision of environmental mitigation\n41\nProvision of balancing pond and associated works and access for maintenance\nProvision of environmental mitigation\n46, 151, 157r, 245, 264, 267, 300a, 300b, 300c, 478, 479\nProvision of worksite and access for construction\nDiversion or installation of, or works to, utility apparatus\n63a, 63b, 63c, 63d, 63f, 63g, 63h, 63i, 63j, 63k, 85a, 85b, 85c, 85d, 85e, 85f, 85g, 85h, 85i, 85j, 85k, 87c, 87e, 87f, 87g, 87h, 87i, AP2-5, AP2-7, AP2-9, AP4-25 to AP4-28\nReinstatement of businesses or facilities\n67\nProvision of worksite and access for construction\nProvision and renewal of railway systems for operational purposes and drainage\n102a, 102b, 102c, 102d, 157d, 157f, 157h, 157i, 157k, 246, 248, 251a, 251b, 251c, 251d, 251e, 251f, 251g, 251h, 251j, 251k, 251n, 261, 263, AP4-20 to AP4-22, AP4-24\nDiversion or installation of, or works to, utility apparatus\n157c, 157e, 157g, 274a, 322, 355, 363, 376\nProvision and renewal of railway systems for operational purposes and drainage\n223\nProvision of worksite and access for construction\nProvision of access for construction and maintenance\n268\nProvision and renewal of railway systems for operational purposes and drainage\nDiversion or installation of, or works to, utility apparatus\n269, 271 to 273, 324, 419\nProvision of worksite and access for construction\nProvision of balancing pond and associated works and access for maintenance\n300d, 300e\nRemoval of utility apparatus\n19, 304, 305, 306, 326, 326a\nProvision of balancing pond and associated works and access for maintenance\n332, 334, 339, 340, 345, 346, 360, 366, 379, 384, 387, 388, 395, AP4-30, AP4-31\nProvision of worksite and access for construction and maintenance\n367, 368\nProvision and renewal of railway systems for operational purposes and drainage\nProvision of worksite and access for construction and maintenance\n437\nProvision of worksite and access for construction\nProvision of a turning head\n317\nMinor highway alterations\nCity of Manchester\n1 to 6\nModification to depot",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukpga/2017/7/schedule/5/paragraph/wrapper3n1",
    "retrieved_at": "2026-10-29T09:05:43.605189+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}